My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10661
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2011 10:59:15 AM
Creation date
2/3/2011 10:59:13 AM
Metadata
Fields
Template:
Building Department
Company Name
FUNG GARDENS
Building Department - Doc Type
Permit
Permit #
10-10661
Building Department - Name
FUNG GARDENS
Address
5118 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZEPHYRHILLS FIRE DEPARTMENT <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Chief Keith Williams BUS (81 3)780 -004 Fax (813)780; -0044 <br /> FIRE SERVICE USER FEES <br /> Occupancy No.: J <br /> Plan No.: /® b 7 £ 9 Contractor: i j eali Sh� y C'&74 /� <br /> Business Name: ,)1, 6 alr.ae Billing Address: 4"3/t. ¶ <br /> Business Address: S 1.7 G,- /� Le` � /".1-- S WSZI <br /> Business Phone No Billing Phone No.: I 8b- 74z-734:2 <br /> Business Fax No.: Billing Fax No:: <br /> Contact: Contact: <br /> PLAN REVIEW FEES _ INSPECTION FEES PERMIT FEE ! _ FALSE ALARM FEE <br /> _ Site Plan N/C _ Annual N/C Sprinkler $5C1 _ 1st Alarm N/C <br /> _ Multi Family /Commercial .06 sf 1st Re- inspection N/C Standpipes $501 __ 2nd Alarm N/C <br /> (Minimum Charge $25.00 2nd Re- inspection $100 Fire Pump $501 ;3rd Alarm N/C <br /> -- <br /> 0 Plan Revisions DBL _ 3rd Re- inspection $250 Hoods _14th Alarm $100 <br /> 4th Re- Inspection $500 Fire Alarm _ 5th Alarm $150 <br /> SPRINKLER SYSTEMS (Business closed until LP Gas $50 _6th Alarm $200 <br /> 0 - 25 Heads $50 violations corrected) Natural Gas $50 NON COMPLIANCE $150 <br /> 26 plus Heads $100 _ SPRINKLER SYSTEMS Fuel Tanks- per tank $50 <br /> STANDPIPE SYSTEM _ Hydro Undergrounds $45 Sparklers $109 I . <br /> 0 Per Riser $50 _ Hydrostatic Test $65 per system Fire Works <br /> $500 <br /> FIRE PUMP _ Acceptance Test $45 par system Camp Fire $251 <br /> 0 Per Pump $100 Hydrant Flow $75 Controlled Bum $100 <br /> FIRE ALARM SYSTEM Hood/Duct $50 <br /> — 0 - 25 Devices $50 _ FIRE ALARM SYSTEM Place of Assembly $50 ! Annual <br /> 26 plus Devices $100 _ System Acceptance $50 Fire Protection - $25 <br /> _ SUPPRESSION SYSTEMS _ Recall Acceptance $5 0 Flammable Application $50 Annual <br /> — Wet $50 _ OTHER <br /> Waste Tire Storage . $50 Annual <br /> Dry $50 _ Fire Wall/Smoke Wall $15 per wall Generator < KW $10 <br /> — CO2 $50 _ LP Gas $25 per tank Generator >30 KW 150 <br /> _ Other $50 _Natural Gas $25 per system Bio- Hazard Waste $10 Annum <br /> KITCHEN EXHAUST Fumigation Tenting $501 <br /> pi Hood/ reater $15 <br /> 9 _ Tent 10'x10' or per tent Torch Pot/Applied $50 <br /> OTHER Fire Pump $45 Haz. Materials $100; Annual <br /> LP Installation per tank $50 _ Fire Suppression $30 <br /> Fuel Tank installation $50 System Acceptance <br /> (Per Tank) $50 Exhaust Hood/Duct �/ <br /> ❑ Natural Gas Installation $50 � Re inspection DBL <br /> (Per System) (other than annual) <br /> 0 Spray Booth $50 0 Inspection scheduled DBL <br /> and cancelled Tess than <br /> 24 hours <br /> Construction Insp. N/C <br /> e _ Emergency Vehicle A <br /> 21 4 FALSE ALARM <br /> PLANS TOTAL tij INSPECTION TOT PERMIT TOTAL TO50 TALI I <br /> ■ <br /> GRAND TOTAL IIIIII Main <br /> Comments: <br /> Date: e 2* o <br /> InspActor: -`. / -° /t_e...l. 46, <br />
The URL can be used to link to this page
Your browser does not support the video tag.