My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10680
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2011 11:19:56 AM
Creation date
2/3/2011 11:19:53 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10680
Building Department - Name
JOHNSON,DEAN
Address
5930 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?010 11:03 8137839747 DEAN JOHNSONS MUSIC PAGE 01/02 <br /> • TAt scsi-rA <br /> TY: ER Roofing I <br /> 8949 Gall Boulevard, Zephyrhills, R 33541 <br /> PH: (813) 782 -0920 & (3.52) 567 -8580 Fax: (813) 71 5-4875 <br /> • STATE CERTIFIED BUILDING AND ROOFING b©NTRACTOR #CB- CC.59817 dtld A CC CQ581.';a <br /> SERVING FLORIDA'S FI NEST HOMES 8, RUSI NESSES SINCE 1976 www.schapercons # ruction.eom <br /> Name S d'� � cn,� Date ; <br /> Address 5 ° :� d / r�i � � , � Phone el 7 ;; - YR' ' <br /> Alt Phone <br /> City � . � ' 1 State ) =La._ Zip ,33,5-4 / <br /> • <br /> Parcel # <br /> . We hereby propose to furnish materials and labor necessary for the completion of <br /> • <br /> • I DURO - LAST Roofing System Proposal <br /> 1: !Barricade off work area as needed. <br /> . 2. ; Remove loose debris from flat roof <br /> • 3. ;Remove existing fleshings and boots as required. <br /> 4. Check substrate decking for water damage. Replacement of decking will be done ono time and material. <br /> 'basis at the rate of k', °° dollars per man -hour plus materials marked up a S" <br /> contractor's fee. <br /> • 5. 'Install insulation, mechanically attached per manufacturers specification. <br /> 6.' 'Install DURU.- LAST m embran.e. <br /> 7. 'Disconnect and reconnect A/C unite as required. <br /> Note: Schaper Roofing cannot he responsible for the existing condition ofthe _{soon tines. <br /> ductwork, electrical or the A/C units due to the age ofthe units. <br /> • <br /> • 8. Install ne'wv DURO -LAST boots, custom curb and corners as required. <br /> Install two -way vents as required. <br /> 10. Install term bar as required- <br /> Scba_per Roofing, Commitment to Quality <br /> • All work s1Sa11 be carefully supervised and completed by workmen skilled and knowledgeable in methods needed <br /> to produce high quality work. <br /> • related debris after completion. <br /> • The yard shall be swept with a magnet. <br /> • The contractor shall provide pexnait, workman compensation, and general liability insurance. <br /> • Carpentry, authorized change orders and work, which are not covered under the -scope of wor , outlined herein, <br /> shall be performed on a time and material basis unless otherwise agreed upon. <br /> [3part) DURO -LAST Roofing Proposal GFLdoc Page 1 of ) <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.