Laserfiche WebLink
Plumbing Scope of Work (Continued) <br /> • Install new tubs and fixtures as necessary <br /> • Install new commodes and fixtures (at finish) as necessary <br /> • Check for any damage after demolition and repair as needed <br /> • Install new hot water heater <br /> Electrical Scopes <br /> • Repair damaged ground wire in switch, outlet, and light boxes <br /> • Keep existing recessed cans as necessary <br /> • Keep all light fixtures and ceiling fans, reinstall at finish <br /> • Install all new outlets, switches and trim plates <br /> • Install all new recess trims <br /> • Install all new light bulbs throughout homes <br /> Insulation Scopes <br /> • Install new insulation to match or better from whatever was removed during <br /> demolition <br /> • Check and install any fire stopping as needed <br /> Inspections (rough in) <br /> • Mechanical <br /> • Plumbing <br /> • Electrical <br /> • Insulation <br /> Inspections (fmal) <br /> • Mechanical <br /> • Plumbing <br /> • Electrical <br /> • Insulation <br /> • Final CIO <br /> Page 2 of 2 <br /> - . 600 N. Westshore Boulevard, Suite 900_Tampa;_FL 33609 • Phone: 813 - 882 -4663 • Fax: 813 - 884 -2082 ICI <br /> LENNAR.COM <br />