My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10705
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2011 2:45:08 PM
Creation date
2/4/2011 2:45:06 PM
Metadata
Fields
Template:
Building Department
Company Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
10-10705
Building Department - Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zephyrhills Fire Rescue <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Marshal Bus (813) 780 -0041 <br /> Kerry Barnett Fax (813) 780 -0044 <br /> E -mail: kbarnett(a)fire.zephyrhills.fl.us <br /> Plan Review #: 10 -075 <br /> Project: Interior Renovation <br /> Number of Pages: 17 <br /> July 1, 2010 <br /> I have received and reviewed the plans for the renovation of the pharmacy area located at <br /> 7050 Gall Blvd and will allow the project to move forward. Please note that this review <br /> does not eliminate any further requirements as the project continues moving forward. By <br /> receiving permit, contractor acknowledges to comply with the items listed below. Should <br /> anyone have any questions, please do not hesitate to contact the Fire Marshal's office. <br /> 1. Renovation shall be compliant to the Florida Fire Prevention Code <br /> 2. Fan will be allowed to stay on at time of alarm activation due to Fl Building <br /> Code Chapter 419.3.12.3 <br /> 3. Separate plans will not be required for fire alarm and fire sprinkler systems <br /> because renovation only includes several devices. Permit to perform the jobs <br /> will be included on the construction permit. <br /> Inspections Required: <br /> 1. Pressure test on new head installation. <br /> 2. Alarm test to check device. <br /> 3. Final (includes safety lighting test w /generator) <br /> KE' ' BARNETT, FIRE MARSHAL <br /> ** *Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br /> submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with all applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveals areas of non - compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.