My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10725
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2011 3:11:53 PM
Creation date
2/4/2011 3:11:51 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10725
Building Department - Name
GHANI,ABDUL
Address
5821 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 20,2010`16:48 Ehrman Systems Ent . Inc . (352) 567 -7459 Page 1 <br /> Proposal <br /> osai <br /> Environmental Contractors CAC1814472 June 18, 2010 <br /> • <br /> 10221 Hwy 301 Summary: ESTIMATE <br /> Dade City, FL 33525 Reference #: 12.468 -105 <br /> (352)567 -5515 (813)783 -2552 <br /> Due Date: 6/28/2010 <br /> Job Name: <br /> Lou Williams Lou Williams <br /> Mid -Town Clinic Mid -Town Clinic <br /> 5821 Gall Blvd. 5821 Gall Blvd. <br /> Zephyrhills, FL 33542 Zcphyrhills, FL 33542 <br /> (813)788 -5524 Job Tel (813)788 -5;324 <br /> We Hereby Submit Specifications And Estimates For: <br /> item* * "'""" T'W 0 A/C SYSTEM INSTALLATION <br /> INSTALL : <br /> 3.0 ton FRIGIDAIRE A/C Air Handler & 3.0 ton FRIGIDAIRE A/C Condenser <br /> 13.0 SEER R-410 Freon 0.10 KW Aux, Heat <br /> + +++ + + + ++ + ++ + + + + + + + + + +++++ +++,. INSTALLATION INCLUDES + +++ + + + + + + + + + + + + ++-t +r 4 •t-4 <br /> a) Remove and dispose of old equipment <br /> b) Install new air handler & condensing unit <br /> c) Connect to existing duct system <br /> d) Connect to existing copper Freon lines and pvc drain lines <br /> e) Connect to existing electric wiring <br /> f) Connect to existing low- voltage wiring <br /> g) Install full concrete base pad for condenser <br /> h) Install new float switch in primary pan <br /> i) New digital thermostat <br /> j) Start-Up and check operation of system <br /> k) Permit for A/C system change -out <br /> WARRANTY : 1 YEAR PARTS / 5 YEAR COMPRESSOR <br /> 1 YEAR LABOR / MATERIALS <br /> PRICE WILL HOLD AS LONG AS BOTH SYSTEMS INSTALLED BY 9/1/10 <br /> . We propose horeby to furnish material and labor - complete in accordance with the above specifications, for the <br /> sum of: 57,900,00 <br /> All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any allwation or <br /> deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above <br /> the estimate, All agreements contingont upon delays beyond our control. Purchaser agrees to pay all costs of collection, including attorney's fees. <br /> This proposal may be withdrawn by us If not accepted by the above due date . <br /> Authorized Acceptance <br /> Signature Signaturo . - Date __ <br />
The URL can be used to link to this page
Your browser does not support the video tag.