My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10760
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 9:09:08 AM
Creation date
2/7/2011 9:09:05 AM
Metadata
Fields
Template:
Building Department
Company Name
SUNSET ESTATES
Building Department - Doc Type
Permit
Permit #
10-10760
Building Department - Name
MCMAHAN,MARY MARGARET
Address
39423 9TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MULE -HIDE PRODUCTS CO., INC. <br /> MECHANICALLY ATTACHED PVC SYSTEM SPECIFICATION <br /> 07520 /MUL <br /> PART 1 — GENERAL <br /> 1.01 Description <br /> A. Scope: <br /> 1. Fumish and install a Mechanically Attached Mule -Hide Reinforced PVC Roofing <br /> Membrane with flashings and accessories necessary to comprise a roofing <br /> system. <br /> B. Related Work: <br /> The work includes, but is not necessarily limited to the installation of: <br /> 1. Vapor Retarder (where specified) <br /> 2. Wood Blocking (Nailers) <br /> 3. Insulation <br /> 4. Slip Sheet (where required) <br /> 5. Fasteners <br /> 6. Roof Membrane <br /> 7. Roof Membrane Flashings <br /> 8. Metal Flashings <br /> 9. Adhesives <br /> 10. Sealants <br /> 11. Walkways <br /> 1.02 Quality Assurance <br /> A. The Mule -Hide Reinforced PVC Membrane Roofing System shall be installed by an <br /> independent roofing contractor eligible to apply for Mule -Hide warranties when Standard <br /> System and Premium System Warranties are requested. <br /> B. There shall be no deviations from this specification or the Mule -Hide Products Co. ("Mule - <br /> Hide") standard details without prior written approval from Mule- Hide's Customer Service <br /> Department. <br /> C. Upon completion of the installation according to the terms and conditions stated in this <br /> specification and in accordance with the information provided in the Warranty Application <br /> and Pre -Job survey form and any additional approvals which might have been given by <br /> Mule -Hide, an authorized representative of Mule -Hide may perform an on -site inspection <br /> 1.03 Submittals <br /> A. Prior to the time of bidding, the roofing contractor shall submit to the Owner or Owner's <br /> representative the following items: <br /> 1. Copies of Mule- Hide's specification and published product data. <br /> 2. Samples of each material to be used in the roof system. <br /> 3. Specimen copy of Mule -Hide Products Co. warranty <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.