Laserfiche WebLink
D. Do not use open flames for drying of surfaces, sealants, or adhesives. <br /> E. Do not use oil -based paint on PVC Coated Metal or membrane. Contact Mule- Hide's <br /> Customer Service Department for recommendations. <br /> F. Do not allow muriatic add (masonry cleaner) to come in direct contact with the Mule -Hide <br /> PVC Membrane or accessory products. <br /> PART 3 - EXECUTION <br /> 3.01 General <br /> When installing a Mechanically Attached Mule -Hide Reinforced PVC Membrane Roofing System in cooler <br /> weather, it is recommended that liquids such as solvents, sealants, etc. be stored at temperatures <br /> between 60 °F and 80 °F until just prior to use in order to facilitate the installation. Liquid products, if <br /> stored outdoors, should be brought up to room temperature prior to use. <br /> 3.02 Substrate Conditions <br /> The following general conditions apply to the substrate that will receive a Mechanically Attached Mule - <br /> Hide PVC Membrane Roofing System for both reroof and new construction: <br /> A. The roof deck must be structurally sound to provide proper securement for mechanical <br /> fasteners. Areas showing a loss of integrity due to corrosion, rotting, warping, concrete <br /> spelling, etc., must be repaired or replaced prior to installing the roofing system. <br /> B. It is imperative that the roofing contractor performs test cuts at each roof area prior to <br /> reroofing. The condition of the substrate must be suitable to receive a Mechanically <br /> Attached Mule -Hide PVC Roofing System. Wet insulation must be removed and <br /> replaced. See SPRI's guidelines for determining wet insulation. <br /> C. A determination must be made regarding the presence or absence of coal tar pitch within <br /> the existing roof assembly. The presence of coal tar pitch requires a separation layer of <br /> insulation a minimum of 1 -1/2" thick having a minimum "R" value of 5.0 if the coal tar <br /> pitch is 10 years or older. All joints must be butted tightly together or have joints <br /> completely taped to prevent volatiles from damaging roof membrane. If the existing <br /> assembly is less than 10 years old, specific procedures must be followed. Contact Mule - <br /> Hide Customer Service Department for specific requirements. <br /> D. Contact Mule -Hide Customer Service Department when the substrate is exposed to <br /> excessively high humidity and /or a corrosive environment. Special fasteners (i.e., <br /> stainless steel) or details may be required. <br /> E. It is acceptable to install a Mechanically Attached Mule -Hide PVC Membrane Roofing <br /> System over the following deck substrates_pfgvjgjgsi that a0 at -,ref tayP iRC„iat��,.l <br /> barrier /cover board or an appropriate slip sheet is installed over the substrate as needed: <br /> 1. Structural Metal Deck (24 -gauge minimum) shall conform to recommendations <br /> outlined in Factory Mutual's Loss Prevention Data Sheet 1 -28. Pullout tests are <br /> required on all decks less than 22 gauge. An insulation or barrier board is <br /> required to provide a smooth surface and shall be of sufficient thickness to span <br /> the steel flutes without damage from traffic. <br /> 2. Plywood should conform to Factory Mutual's requirements should tested (for <br /> uplift) assemblies be required. For non-FM assemblies, plywood minimum <br /> thickness shall be determined by local code requirements but shall not be less <br /> 8 <br />