My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10762
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10762
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 9:13:06 AM
Creation date
2/7/2011 9:13:03 AM
Metadata
Fields
Template:
Building Department
Company Name
EILAND PARK TOWNHOMES
Building Department - Doc Type
Permit
Permit #
10-10762
Building Department - Name
US HOMES CORP - LENNAR
Address
37556 DALIHA TERR BLDG 21 #210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK FOR PASCO COUNTY <br /> Original Permit # 6016 <br /> Home Address 37556 Daliha Terrace, Zephyrhills, FL 33542 <br /> Construction Value: $26,574.00 <br /> Pre - Demolition <br /> • Disconnect electric panel from home <br /> • Keep one (1) GFI outlet in garage only for irrigation, pool (if needed) and power <br /> for repairing home <br /> • Turn off gas line in home (if needed) <br /> • Remove existing outlets and switches from electrical boxes ti419' <br /> Demolition <br /> .• Remove selected drywall P 1 , k S ) � ti � " � �. <br /> • Remove insulation (except foam insulation against bloc <br /> • Remove/Repair any damage to existing studs <br /> P <br /> • Remove cabinets, countertops and fixtures as necessItcy <br /> • Remove tubs, commodes, sinks and hot water heater 90.c" <br /> • Remove all appliances as necessary <br /> • Remove all duct work and air handler, refrigerant lines and HVAC grills <br /> • Remove flooring -tile, carpet, hardwood, etc. as needed <br /> • Remove all interior doors and trim, mirrors and shower doors as needed <br /> • Remove /repair any copper damaged by drywall <br /> • Remove all switches and outlet plates <br /> • Note: during demolition we will bring home back to rough -in mechanical, <br /> electrical and plumbing stage. No structural changes will be made in home. <br /> Mechanical Scope of Work <br /> • Re- install all new trunk lines and duct work per what is in existing homed ;, pry: Wild ALL <br /> including bath fans FLOI <br /> r T <br /> ,'1`'.EVAILTNG A EDILDA - <br /> J <br /> .� � <br /> • Replace interior compressor unit IvATI01�I, °,L F?�vCTPdC CODE <br /> CODE, �� ;, <br /> 11 it_ ; iL LS' <br /> Plumbing Scope of Work 1- <br /> • Repair and replace any damaged copper <br /> • Install new copper after removal as necessary <br /> • Install new tubs and fixtures as necessary 7 -24-(o <br /> • Repair and replace any damaged copper - <'' ` iATE <br /> • Install new copper after removal as necessary , E z, Of f ; PI•IYRHILLS <br /> ��N _ ,MINER (CS <br /> Page 1 of 2 <br /> 600 N. Westshore Boulevard, Suite 900 Tampa, FL 33609 • Phone: 813 - 882 -4663 • Fax: 813- 884 -2082 <br /> LENNAR.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.