My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10776
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 9:42:59 AM
Creation date
2/7/2011 9:42:57 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10776
Building Department - Name
DESCOTEAU,NORA & BOYETTE,TIM
Address
5315 5TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ft) f fe-a-kyril <br /> L 7 <br /> Roofing 1' 1 C <br /> Shingle Re-roof continued <br /> Schaper Roofing, Commitment to Quality <br /> All work =hall hP carefully superi=:ed and complet by workmen stilled and knowlettgeable in methods needed to <br /> produce high quality work. <br /> Tb e. job site Alan be kept dea n dailv for the duration of the job and the ground: shall be left clean ef all roof related <br /> debris after completion.. <br /> *The yard shall be swept with a magnet. <br /> *The contractor shall provide permit, workman compensation, and general liability insurance. <br /> *Carpentry, authorized rhafig Of &ft: and work, which are not coverPd under the cope of work outlined herein, shall be <br /> perfOrmed on a time and material basis unless otherwise agreed WWI. <br /> MANUFACTURER Si CONTRACTOR WARRANTY (S) <br /> Upon completion of the work and payment of all monies owed, Contractor shall issue: <br /> 1. A year warranty for workmanship limited to leaks cane d by any component installed by the C: oft/ tor <br /> 2. Shingle manufacturer shall provide a year limited warranty_ <br /> CON PRICING <br /> T & _Allwance <br /> / <br /> Shingle Re-roof as described herein t <br /> Modifications Tp c es) y CT I ' <br /> . _ <br /> TOTAL AC4?..F.ED UPON CONTRAcr PRICE, LABOR AND $ i <br /> TERMS 1 . opcc <br /> , - d/LIP 4.411 - ■ • <br /> Price Valid For ::::3CF) Day E <br /> Collection costs if any, together with interes t shall be added to the contract price if payment default occurs. <br /> Cancel or of the contract after the 72,-hour grace period shall incur a nominal fee. <br /> QS) <br /> Date <br /> Se e Rt4in InSepre';entafive <br /> accept I pn - and terms _ we authorized to begin work. <br /> Signed Date <br /> [31:; art] SHRICILE RE-ROOF CFI. do c Pa.ee 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.