Laserfiche WebLink
FORM 1100A -08 <br /> Code Compliance Cheklist <br /> Residential Whole Building Performance Method A - Details <br /> ADDRESS: PERMIT #: <br /> TAMPA, FL, <br /> INFILTRATION REDUCTION COMPLIANCE CHECKLIST <br /> COMPONENTS _ SECTION _ REQUIREMENTS FOR EACH PRACTICE CHECK <br /> Exterior Windows & Doors N1106.AB.1.1 Maximum: .3 cfm /sq.ft. window area; .5 cfm /sq.ft. door area. <br /> Exterior & Adjacent Walls NI 106.AB.1.2.1 Caulk, gasket, weatherstrip or seal between: windows/doors & <br /> frames, surrounding wall; foundation & wall sole or sill plate; joints <br /> between exterior wall panels at corners; utility penetrations; <br /> between wall panels & top/bottom plates; between walls and floor. <br /> EXCEPTION: Frame walls where a continuous infiltration barrier is <br /> installed that extends from, and is sealed to, the foundation to the <br /> top plate. <br /> Floors N1106.AB.1.2.2 Penetrations/openings > 1/8" sealed unless backed by truss or <br /> joint members. <br /> EXCEPTION: Frame floors where a continuous infiltration barrier <br /> is installed that is sealed to the perimeter, penetrations and seams. <br /> Ceilings N1106.AB.1.2.3 Between walls & ceilings; penetrations of ceiling plane to top floor; <br /> around shafts, chases, soffits, chimneys, cabinets sealed to <br /> continuous air barrier; gaps in gyp board & top plate; attic access. <br /> EXCEPTION: Frame ceilings where a continuous infiltration barrier <br /> is installed that is sealed at the perimeter, at penetrations and <br /> seams. <br /> Recessed Lighting Fixtures N1106.AB.1.2.4 Type IC rated with no penetrations, sealed; or Type IC or non -IC <br /> rated, installed inside a sealed box with 1/2" clearance & 3" from <br /> insulation; or Type IC with < 2.0 cfm from conditioned space, <br /> tested. <br /> Multi-story Houses N1106.AB.1.2.5 Air barrier on perimeter of floor cavity between floors. <br /> Additional Infiltration reqts N1106.AB.1.3 Exhaust fans vented to outdoors, dampers; combustion space <br /> heaters comply with NFPA, have combustion air. <br /> OTHER PRESCRIPTIVE MEASURES (must be met or exceeded by all residences.) <br /> COMPONENTS , SECTION REQUIREMENTS _ _ CHECK <br /> Water Heaters N1112.AB.3 Comply with efficiency requirements in Table NI12ABC.3. Switch <br /> or clearly marked circuit breaker (electric) or cutoff (gas) must be <br /> _provided. External or built -in heat trap required. <br /> Swimming Pools & Spas N1112.AB.2.3 Spas & heated pools must have covers (except solar heated). <br /> Non - commercial pools must have a pump timer. Gas spa & pool <br /> heaters must have a minimum thermal efficiency of 78 %. <br /> Heat pump pool heaters shall have a minimum COP of 4.0. <br /> Shower heads N1112.AB.2.4 Water flow must be restricted to no more than 2.5 gallons per <br /> min ute at 80 PSIG. <br /> Air Distribution Systems N1110.AB All ducts, fittings, mechanical equipment and plenum chambers <br /> shall be mechanically attached, sealed, insulated and installed in <br /> accordance with the criteria of Section NI 110.AB. <br /> Ducts in unconditioned attics: R -6 min. insulation. <br /> HVAC Controls N1107.AB.2 Separate readily accessible manual or automatic thermostat for <br /> each system. <br /> Insulation N1104.AB.1 Ceilings -Min. R -19. Common walls -frame R -11 or CBS R -3 both <br /> N1102.B.1.1 sides. Common ceiling & floors R -11. <br /> 3/24/2009 2:51 PM EnergyGauge® USA - FlaRes2008 Page 5 of 5 <br />