Laserfiche WebLink
Page 4 of 6 TFP176 <br /> Installation ARROW MUST <br /> POINT AWAY <br /> The Series TY -FRB Sprinklers must 7/16" FROM AND BE O <br /> kw- <br /> 0 <br /> be installed in accordance with the fol- ESCUTCHEON (11,1 mm) PERPENDICULAR <br /> lowing instructions: PLATE SEATING ** NOMINAL TO THE BACK <br /> SURFACE NPT MAKE -IN WALL SURFACE <br /> 4 <br /> NOTES <br /> Do not install any bulb type sprinkler if *6 <br /> s -�� -t <br /> the bulb is cracked or there is a loss of * <br /> liquid from the bulb. With the sprinkler I IIIL � _ f _ '..,, ; 5 <br /> held horizontally, a small air bubble 2 - 3/16" �� } IM 2 - 3/16" I <br /> should be present. The diameter of the (55,6 mm) /IL \I► (55,6 mm) 4 <br /> air bubble is approximately 1/16 inch i `III J ` <br /> (1,6 mm) for the 135F/57°C to 3/32 1.1/2 � r ` � 2 <br /> inch (2,4 mm) for the 286 °F /141 °C WRENCH �� <br /> temperature ratings. (38,--u2 - FLATS 7 p 3 <br /> A leak tight 1/2 inch NPT sprinkler joint z� ^� YYY• <br /> should be obtained with a torque of 7 1 <br /> to 14 ft.lbs. (9,5 to 19,0 Nm). A maxi- SHOWN SHOWN CROSS <br /> mum of21 ft. lbs. (28,5 Nm) of torque PENDENT UPRIGHT SECTION <br /> may be used to install sprinklers with <br /> 1/2 NPT connections. Higher levels of <br /> torque may distort the sprinkler and 1 - Frame 3 - Sealing 4 - Bulb 6 - Deflector <br /> cause leakage or impairment of the 2 - Button Assembly 5 - Compression 7- Ejection Spring <br /> sprinkler. Screw <br /> Do not attempt to make -up for insuffi- <br /> cient adjustment in the escutcheon * Temperature rating is indicated on deflector or adjacent to orifice seat on frame. <br /> plate by under or over - tightening the * *Pipe thread connections per ISO 7/1 can be provided on special request. <br /> sprinkler. Readjust the position of the <br /> sprinkler fitting to suit. FIGURE 2 <br /> The Series TY -FRB Horizontal and 5.6 K- FACTOR QUICK RESPONSE <br /> Vertical Sidewall Sprinklers must be SERIES TY -FRB VERTICAL SIDEWALL (TY3431) SPRINKLERS <br /> installed in accordance with the follow- <br /> ing instructions. <br /> Step 1. Horizontal sidewall sprinklers <br /> are to be installed in the horizontal <br /> position with their centerline of water- Step B. After installing the Style 10 or Care and <br /> way perpendicular to the back wall and 20 Mounting Plate over the sprinkler <br /> parallel to the ceiling. The word "TOP" threads, hand tighten the sprinkler into <br /> on the Deflector is to face towards the the sprinkler fitting. Maintenance <br /> ceiling. Step C. Tighten the sprinkler into the <br /> Vertical sidewall sprinklers are to be sprinkler fitting using only the W -Type The maintained and ance with the following g i instructions: <br /> accord- n - <br /> installed in the pendent or upright po- 7 Recessed Sprinkler Wrench (Ref. nd s e <br /> sition with the arrow on the Deflector Figure 6). With reference to Figure 1, s: <br /> pointing away from the wall. the W -Type 7 Recessed Sprinkler NOTES <br /> Step 2. With pipe thread sealant ap- Wrench is to be applied to the sprinkler Before closing a fire protection system <br /> plied to the pipe threads, hand tighten wrench flats. main control valve for maintenance <br /> the sprinkler into the sprinkler fitting. Step D. After the ceiling has been in- work on the fire protection system that <br /> Step 3. Tighten the sprinkler into the stalled or the finish coat has been ap- it controls, permission to shut down <br /> sprinkler fitting using only the W-Type plied, slide on the Style 10 or 20 Clo- the affected fire protection system <br /> 6 Sprinkler Wrench (Ref. Figure 5), sure over the Series TY -FRB Sprinkler must be obtained from the proper <br /> With reference to Figure 1 or 2, the and push the Closure over the Mount- authorities and all personnel who may <br /> W-Type 6 Sprinkler Wrench is to be ing Plate until its flange comes in con- be affected by this action must be no- <br /> applied to the wrench flats. tact with the ceiling tified. <br /> The Series TY -FRB Recessed Hori- The owner must assure that the sprin- <br /> zontal Series TY-FRB <br /> Sprinklers must be k/ers are not used for hanging of any <br /> installed in accordance with the follow- objects; otherwise, non - operation in <br /> ing instructions. <br /> the event of a fire or inadvertent opera- <br /> tion may result. <br /> Step A. Recessed horizontal sidewall Absence of an escutcheon, which is <br /> sprinklers are to be installed in the <br /> horizontal position with their centerline used to cover a clearance hole, may <br /> of waterway perpendicular to the back delay the time to sprinkler operation in <br /> wall and parallel to the ceiling. The a fire situation. <br /> word "TOP" on the Deflector is to face Sprinklers that are found to be leaking <br /> towards the ceiling. or exhibiting visible signs of corrosion <br />