Laserfiche WebLink
r � , ' h Fes § i ° ° 4 t ., , � <.. 1 ' P. . <br /> 1\ mss,. ` I o >. *,: 0a , <br /> N is, z C'``£, a� ° 4 "S,1n a a z T iaF <br /> 1. The Series 1100 MEGALUG joint re- just prior to slipping the gasket onto 4.* Push the gland toward the socket <br /> straint is designed for use on ductile the plain end for joint assembly. and center it around the pipe with <br /> iron pipe conforming to ANSI /AWWA Place the gland on the plain end the gland lip against the gasket. <br /> C151/A21.51 (all thickness classes) with lip extension toward the plain Insert bolts and hand tighten nuts. <br /> when restraining mechanical joint end, followed by the gasket. Make deflection after joint assembly <br /> pipe fittings. but before tightening bolts. <br /> NOTE: In cold weather it is preferable to warm <br /> the gasket to facilitate assembly of the joint. <br /> 2.* Clean the socket and the plain end. <br /> Lubrication and additional cleaning <br /> should be provided by brushing both 3•* Insert the pipe into the socket and <br /> the gasket and the plain end with press the gasket firmly and evenly <br /> soapy water or an approved pipe into the gasket recess. Keep the <br /> lubrication meeting the requirement joint straight during assembly. <br /> of ANSI /AWWA C111/A21.11, <br /> , <br /> 4. (cont.), ., 4 s §4�� ' 5" 6- ,� , <br /> y ' 5 <br /> 5.* Tighten the bolts to the normal In large sizes (30 -48 inch), five or 7. If removal is necessary, utilize the 5 /8 <br /> range of torque as indicated [3 inch more repetitions may be required. inch hex heads provided. If reas- <br /> 45-60 ft -Ibs., 4 -24 inch 75 -90 ft- The use of a torque- indicating sembly is required, assemble the <br /> lbs., 30 -36 inch 100 -120 ft -Ibs., and wrench will facilitate this procedure. joint in the same manner as above, <br /> 42 -48 inch 120 -150 ft -Ibs.] While at by tightening the wedge bolts to 90 <br /> all times maintaining approximately 6 Tighten the torque limiting twist- ft -Ibs. If the series 1100 restraint <br /> the same distance between the off nuts in a clockwise direction is removed from the pipe, be sure <br /> gland and the face of the flange at (direction indicated by arrow on that all the collar bolts and wedges <br /> all points around the socket. This top of nut) until all wedges are in are in place before the restraint is <br /> can be accomplished by partially firm contact with the pipe surface. reassembled. <br /> tightening the bottom bolt first, then Continue tightening in an alternat- <br /> top bolt, next the bolts at either ing manner until all of the nuts have * These steps are requirements of <br /> side, finally the remaining bolts. been twisted off. AWWA. AWWA Standard C600 <br /> Repeat the process until all bolts <br /> are within the appropriate range of <br /> torque. <br /> For More Information <br /> F or more information about MEGALUG restraints call <br /> EBAA IRON Sales, Inc. EBAA today and request <br /> P.O. BOX 857 Eastland TA 76448 "EBAA Connections Bulletin DI -1" concerning use of <br /> I I the MEGALUG restraint on grey iron pipe, or "EBAA <br /> Connections Bulletin DI -2" covering the background <br /> ,. ** * 1 _ H Tel: (254) 629.1731 <br /> * , ** and operation of the MEGALUG system of restraint. <br /> . _ _ *:*, ° `1 Fax (254) 629.8931 <br /> "Restraint Length Calculation" Software is available <br /> (800) 433.1716 within US and Canada for PC /Windows applications. Support documenta- <br /> contact @ebaa,com lion a bout the software can be found in "EBAA Con- <br /> nections Bulletin PD -1 through PD -5 ". <br /> www,ebaa.com <br />