Series 1600 Submittal Reference Drawing
<br /> E) ,
<br /> a
<br /> I e
<br /> A A 1 A t C s
<br /> i ai
<br /> �\ %' %f U s
<br /> #
<br /> Serrated I.D. T'.uuis f3:.1 ` ion -,e rated LD.
<br /> Re traiut Ring Backup
<br /> A 8 C ll
<br /> Nolnhial S IeS Pipe � NI es itt .t}: OverAJ) T�Bek
<br /> � e; Number .0, O1 seared Col .1 a nt a Len :1 ) bet • )
<br /> 4 1604 4. 6 .75 9 .25 13 2-
<br /> 6 1606 6.90 8,75 11.25 18 2•I4 x 18
<br /> 8 1608 9.05 12.25 14,75 18 2-1/4 x 18
<br /> 10 1610 11.10 14.20 16,85 22 4. 1 /4x22
<br /> 12 1612 13.20 16.90 19.45 22 4•1/4x22
<br /> iiete.ehelldim, in jacks > a subotitoftgevactutnotice.
<br /> Installation Instructions
<br /> d ry X
<br /> �
<br /> 1. The Series 1600 is designed for restraining push -on, 3. Install both halves of the non-serrated bell ring around 5. Remove the side bolts from the serrated restraint ring,
<br /> C900 PVC pipe bells. It has a split, serrated restraint the pipe behind the bell. Install the side bolts and Use the tie bolts to determine the proper location of
<br /> ring on the spigot and a non - serrated ring behind the tighten each to 110 ft-lbs. (60 ft-lbs on 4' and 6') the restraint ring on the spigot Allow enough room
<br /> bell. 4. Slide the bell ring toward the bell so that it fits snugiy on the tie bolt to fully engage the nuts.
<br /> 2. Assemble the push -on joint per the pipe manufacturer's behind the bell.
<br /> x x +
<br /> instructions. �f: ;
<br /> 4,11,„,. ' mommo
<br /> E
<br /> r .,,„, ., ,-._,,,,....,--„,,,,,,,,,-,--,......,-........„,
<br /> EBAA IRON Sales, Inc.
<br /> -. ~ P.O. Box 857, Eastland, TX 76448
<br /> 10. .
<br /> Tel (254) 629.1731
<br /> '' "t:x I , Fax (254) 629.8931
<br /> (800) 4311716 within US and Canada
<br /> 6. Install both halves of the restraint ring at the proper 7. Place nuts on the tie bolts and tighten until they are contact@ebaa,com
<br /> location, tapping each half into place. Make sure that snug, Allow enough room on the tie bolt to fully engage www.ebaa.com
<br /> the complete ID of the ring is touching the pipe before the nut with several threads showing. Do not tighten
<br /> installing the side bolts. Tighten the side bolts evenly to these bolts enough to force the spigot further into the P1R r =ber§ °f .-
<br /> 110 ft-Ibs torque. (60 ft -Ibs on 4' and 6') bell of the joint. " ' r
<br /> ,,,,,..:„.,,,, ,-,,
<br /> ,..
<br /> ,*, 1 A tAtiiICAN FOittdfff?Y SpG7£7Y
<br />
|