My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9708
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2011 10:12:56 AM
Creation date
3/22/2011 10:10:40 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS LLC
Building Department - Doc Type
Permit
Permit #
09-9708
Building Department - Name
H&R BLOCK
Address
7860 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule -1 O® /Schedule -40® <br /> When you specify Allied Schedule -10 /Schedule -40 sprinkler pipe you get a UL listed and FM approved product. <br /> Although these products do not require separate approvals, Schedule -10 /Schedule -40 gives you the extra quality <br /> assurance you demand. Our Sch -10 (1 " - 8 ") pipe and Sch -40 (1"- 21/2") pipe have passed the same thorough lab <br /> testing as our other listed pipe products, and receive periodic mill inspections from both UL and FM agents to <br /> ensure consistent quality. <br /> Q Galvanized Pipe ,,1; t, spc ,r, c .,tto,is <br /> Schedule -10 /Schedule -40 product can be "hot -dip" NPS Nominal I.D. Wt. Wt. (H20 Filled) CRR <br /> galvanized to meet FM requirements for dry systems 1n; mm ; In mm Lbs/Ft;kgim LbslFi;kglm - <br /> in accordance with the zinc coating specifications of 1" 1.049 1,680 2.05 1 <br /> ASTM A -123. 25 26.6 " 2.5 3.05 ` - <br /> 1 1.380 2.270 2.93 1 <br /> Superior Coating 32 35.1 4.36 4.36 - <br /> Our advanced formula mill coating offers a clean, 11/2" 1.610 2.720 3.61 1 <br /> durable surface. It is also paint -ready for custom 40 40.9 4.0 5.37 - <br /> color applications without special preparation. 2" 2.067 3.650 5.13 1 <br /> The internal surface of all Allied Tube & Conduit Fire 50 52.5 5.4 7.63 - <br /> 2 2.469 5.790 7.86 1 <br /> Sprinkler pipe products up to 4.500" in diameter is 65 62.7 85 11.73 - <br /> coated with our new Antibacterial Formula, "ABFII ". <br /> In scientific laboratory tests, ABFII proved to have n - 1u Specittu.tion, <br /> superior resistance to microbial colonization of pipe NPS Nominal I.D. Wt. Wt. (H20 Filled) CRR <br /> walls, thereby inhibiting or possibly preventing the In; mm In; mm IbsIFt kg/m lbs/FZ kg/m - <br /> onset of Microbiologically Influenced Corrosion 1 1.442 1.810 2.525 7.0955 <br /> (MIC) upon installation and the first 25 flushes of 32 36.6, 2.7 3.75 - <br /> the fire sprinkler system.* 1 1.682 2.080 3.04 5.6570 <br /> 40 42.7 3.1 4.52 - <br /> ® American Made 2" 2.157 2.640 4.22 4.5827 <br /> Meets "Buy American" requirement and is available 50 54.8 3.9 6.28 - <br /> through distributors in the USA, Canada, Mexico 2 2.635 3.530 5.89 3.5196 <br /> and Latin America. 65 66.9 5.3 8.77 - <br /> 3" 3.260 4.330 7.94 2.5550 <br /> ® Specifications & Approvals 80 82.8 6.4 11.82 - <br /> Schedule -10 /Schedule -40 pipe are in compliance 4" 4.260 5.610 11.78 1.6020 <br /> with the following: ASTM A -135, and NFPA 13. 90 108.2 8.3 17.53 <br /> All pipe products have a rated working pressure 5" 5.295 7.77 17.33 1.4874 <br /> of 300 psi maximum and also meet the stringent 125 134.5 11.56 25.80 - <br /> requirements for the following applications and 6" 6.357 9.290 23.03 1.0251 <br /> tests: 150 161.5 13.8 34.27 - <br /> • Welded Outlets 8" 8.249 16.490 40.15 1.8365 <br /> • Hydrostatic Pressure 200 209.5 24.5 59.75 - <br /> • Side Wall Rupture <br /> ® ® <br /> * See ABFII warranty <br /> t'a Ii tMsorner Service (800)0882- 6643Fax: (708) 339 -1806 <br /> TUBE& CONDUIT 16100xnitthrop. • Harvey, IL 60426 1 11350 Norcom Rd. • Philadelphia, PA 19154 I 2525 N 27th Ave. • Phoenix, AZ 85009 S5-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.