Laserfiche WebLink
Zephyr Commons <br /> Interior completion- H & R Block <br /> Zephyrhills, FL <br /> December 1, 2009 <br /> Description Quanity Unit Cost Total <br /> General Conditions <br /> Supervision 3 wks 300 900 <br /> Building permit 300 <br /> Total General Conditions 1200 <br /> Doors & hardware <br /> Prehung 3 -0 x 6 -8 3 200 600 <br /> Privacy lockset 3 60 180 <br /> Installation 200 <br /> Total Doors & Hardware 980 <br /> Metal framing & drywal <br /> Partition wall: 3 5/8" metal studs/ 5/8" drywall 71 if <br /> Total framing & drywall 2500 <br /> Plumbing <br /> Install 1 Dayton stainless steel sink with Delta 100 faucet <br /> Install waste and water lines <br /> Install 1 6 gal hot water heater for sink only <br /> Demo and patch concrete floor as necessary. 1 <br /> Total plumbing 2000 <br /> HVAC <br /> None <br /> Electrical <br /> New 2x4 lay-in lighting 1 ea <br /> Relocate 1 2x4 lay in fixture <br /> Relocate emergency /exit lights 1 ea <br /> Electrical outlets 10 ea <br /> Total electrical 1300 <br /> Cabinets <br /> Furnish and install 1 - 8' base cabinet and top 1600 <br /> Total construction budget .&.0 <br /> $12180 <br /> � K - a <br /> // Pa <br /> v ► 4L <br />