Laserfiche WebLink
­1 r 411' •nVIvvl1 <br />STACKED IN KNEE WALL. <br />(TYP•) <br />DENTAL EQUIPMENT COORDINATION: <br />- PLUMBING CONTRACTOR TO VERIFY TYPE AND LOCATION OF <br />ALL DENTAL EQUIPMENT, ROUGH -IN DIMENSIONS, AND REQUIRED <br />PLUMBING CONNECTIONS. PLUMBING CONTRACTOR SHALL <br />FURNISH AND INSTALL ALL FLOOR FIXTURES, FLOOR DRAINS, HUB <br />DRAINS, WATER CLOSETS, LAVATORIES AND FLOOR SINKS. <br />DENTAL EQUIPMENT SUPPLIER SHALL FURNISH AND INSTALL ALL <br />FIXTURES IDENTIFIED ON THEIR PLANS (WITH THE EXCEPTION OF <br />THOSE IDENTIFIED ABOVE). INSTALL ALL DENTAL EQUIPMENT <br />AND PROVIDE ALL FIXTURE TRAPS, SUPPLIES AND STOPS, <br />ISOLATION VALVES, MIXING VALVES, ETC. AND MAKE FINAL <br />CONNECTIONS TO DENTAL EQUIPMENT. VERIFY ALL EQUIPMENT <br />CONNECTIONS WITH THE TENANT AND EQUIPMENT SUPPLIER <br />PRIOR TO INSTALLATION. PROVIDE ADDITIONAL CONNECTIONS AS <br />REQUIRED. COORDINATE ALL WORK ACCORDINGLY. <br />GENERAL NOTES: <br />- ALL VACUUM LINES SHALL BE INSTALLED BELOW SLAB UNLESS <br />OTHERWISE NOTED. <br />- TERMINATE COMPRESSED AIR LINES PER DENTAL EQUIPMENT <br />DETAILS. <br />- COMPRESSED AIR SHALL BE INSTALLED ABOVE CEILING UNLESS <br />OTHERWISE NOTED. <br />- VACUUM PIPING TO BE INSTALLED IN WALLS WHEREVER POSSIBLE. <br />DROP OUT OF WALL AS NECESSARY AND EXTEND TO VACUUM MAIN <br />AS INDICATED. <br />- TERMINATION OF 1 1/2" VACUUM LINES TO BE REDUCED TO 1/2" <br />FEMALE THREAD TYPICAL FOR ALL UTILITY CENTERS, TERMINATION <br />OF 1/2" AIR LINES TO BE 1/2" MALE THREAD WITH 3/8" <br />COMPRESSION FITTING TYPICAL ALL PLUMBING AND ELECTRICAL FOR <br />UTILITY CENTER SHALL BE CONTAINED WITHIN 8" X 14" AREA ON <br />KNEEWALL. SEE DENTAL EQUIPMENT DRAWINGS FOR FURTHER <br />INFORMATION. <br />- REFER TO UNDERGROUND LAYOUT DRAWING PROVIDED BY ASPEN <br />DENTAL MANAGEMENT, INC. PRIOR TO ROUGH -IN OF FIXTURES. <br />Q1 AIR COMPRESSOR TO BE FURNISHED AND INSTALLED BY THE OWNER'S <br />EQUIPMENT PROVIDER. <br />Q2 VACUUM SYSTEM TO BE FURNISHED AND INSTALLED BY THE OWNER'S <br />EQUIPMENT PROVIDER. <br />Q3 ROUTE 1/2" COMPRESSED AIR LINE ABOVE CEILING AND TRANSITION <br />TO HORIZONTAL FOR DISTRIBUTION. VERIFY LINE SIZE AND CAPACITY <br />REQUIREMENTS WITH TENANT AND EQUIPMENT MANUFACTURER PRIOR <br />TO INSTALLATION. <br />® ROUTE 1 1/2" VACUUM PIPING DOWN BELOW FLOOR FOR DISTRIBU11ON. <br />Q ROUTE VACUUM DISCHARGE TO ADJACENT 3" HUB DRAIN AS SHOWN <br />ON SHEET P1.1. DISCHARGE IN ACCORDANCE WITH INTERNATIONAL <br />PLUMBING CODE. <br />® ROUTE 2" PVC UP TO V.T.R. FROM VACUUM HEADS. TERMINATE <br />ABOVE ROOF WITH GOOSENECK FITTING. CONNECTION BY PLUMBER. <br />DO NOT JOIN WITH SANITARY VENT. MAINTAIN ALL CODE REQUIRED <br />CLEARANCES ON THE ROOF. COORDINATE VTR LOCATIONS WITH <br />MECHANICAL EQUIPMENT. <br />Q7 ROUTE 2" PVC UP TO ABOVE SUSPENDED CEILING FOR FRESH AIR <br />INTAKE. DO NOT JOIN WITH SANITARY VENT. <br />® PROVIDE 1" DN IN WALL TO 50 LB LIQUID PETROLEUM CYLINDER AT <br />EXTERIOR OF BUILDING. CONN. TO CYLINDER. CYLINDER BY P.C.. <br />SEE ARCHITECTURAL PLANS FOR ADD111ONAL NOTES. <br />Q ROUTE NEW 1" GAS LINE DOWN IN WALL TO LAB WORK STATION AND <br />PROVIDE 1/2" BRANCH LINES TO INDIVIDUAL LAB STATIONS. VERIFY <br />ROUGH -IN LOCATION WITH TENANT REPRESENTATIVE. SEE LAB WORK <br />STATION ELEVATION 3/P3.0. PROVIDE GAS PRESSURE REGULATOR <br />AND EXTERIOR VENT IF REQUIRED PER OWNER FURNISHED EQUIPMENT <br />(COORDINATE WITH OWNER AS REQUIRED). <br />10 PROVIDE 1/2" GAS LINE AND 1/2" AIR LINE STUBBED OUT AT LAB <br />WORK STA11ON ELEVATION (SEE DETAIL 3/P3.0). PLUMBING <br />CONTRACTOR TO MAKE FINAL CONNECTIONS. SEE SHEET P1.1 FOR <br />ADDITIONAL GAS REQUIREMENTS. PROVIDE GAS SHUT -OFF ABOVE <br />CEILING. <br />11 PROVIDE 1/2" COMPRESSED AIR CONNECTION AT 44" A.F.F. SEE <br />DETAIL D13 -A/MD FOR LABORATORY AIR VALVE AND D13 /MD FOR <br />STERIUZA11ON AIR VALVE DETAILS. <br />1Q PROVIDE 1 1/2" VACUUM CONNECTION AND 1/2" COMPRESSED AIR <br />CONNECTION TO UTILITY CENTER. STUB PIPING UP THROUGH WALL TO <br />UTILITY CENTER ENCLOSURE AT 10" A.F.F. FOR TERMINATION BY <br />OWNER'S EQUIPMENT PROVIDER. SEE DETAIL D -3 /1MD. <br />EXCEL <br />ENGINEERINGinc. <br />100 CAMELOT DRIVE <br />FOND DU LAC, WI 54935 <br />PHONE: (920) 926 -9800 <br />FAX: (920) 926 -9801 <br />Always a Better Plan <br />mmummmmmmmm <br />~ <br />Z <br />Q <br />Lo <br />O <br />Q <br />O <br />W <br />N <br />I <br />Q <br />~ <br />Z <br />Q <br />Y <br />rY <br />W <br />:m <br />Q <br />O <br />W <br />Q. <br />Q <br />z <br />Y <br />W <br />w <br />z <br />.� <br />W <br />U <br />w <br />--J <br />V) <br />(n <br />.. <br />ice- <br />Z <br />W <br />U <br />Q <br />U <br />w <br />Li <br />0 <br />Z <br />z <br />< <br />V) <br />W <br />V) <br />F- <br />O <br />0- <br />Q <br />�-- <br />N <br />(n <br />w <br />� <br />0 <br />J <br />U <br />W <br />N <br />I <br />Q <br />NORTH FLOOR PLAN - AIR AND VACUUM PIPING <br />SCALE: 1/a r_O. <br />NOTES: <br />- ALL PIPING IS TO BE CONCEALED. IF BUILDING CONSTRUCTION DOES NOT PERMIT <br />CONCEALING PIPING, LOCATIONS AND ROUTING ARE TO BE APPROVED BY ARCHITECT /OWNER <br />PRIOR TO INSTALLATION. <br />�az a <br />W <br />V) <br />W <br />H <br />W <br />:D <br />z <br />W <br />z <br />W <br />U <br />w <br />) <br />Q <br />0- <br />I <br />J <br />Q <br />V) <br />Q <br />0 <br />• • <br />I.._ <br />F-- <br />Z <br />0 <br />J <br />� <br />0 <br />J <br />U <br />W <br />J <br />M <br />_J <br />W <br />2 <br />_ <br />O <br />0- <br />W <br />O <br />11 <br />0 <br />W <br />� <br />W <br />CL <br />Q <br />N <br />� <br />N <br />SHEET <br />ISSUE: <br />NORTH FLOOR PLAN - AIR AND VACUUM PIPING <br />SCALE: 1/a r_O. <br />NOTES: <br />- ALL PIPING IS TO BE CONCEALED. IF BUILDING CONSTRUCTION DOES NOT PERMIT <br />CONCEALING PIPING, LOCATIONS AND ROUTING ARE TO BE APPROVED BY ARCHITECT /OWNER <br />PRIOR TO INSTALLATION. <br />�az a <br />