My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10249
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2011 1:20:22 PM
Creation date
3/22/2011 1:20:20 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10249
Building Department - Name
LEAHY,JOHN & DEBRA
Address
3513 AQUAMARINE WAY LT 87 & 88
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.- -_- .. fp .0/g . _ <br /> .. <br /> Procedure for Lot Improvement Requests <br /> (Please refer to "Rules and Regulations') <br /> 1. All requests are to go to Chairman of the Property Evaluation Committee, for the committee <br /> to review. There is a holder labeled "Property Evaluation & Improvements" in the library <br /> for Lot owners to..place their completed forms, in and these forms will be nicked up from <br /> the Library by the Property Evaluation committee. <br /> 2. Any request which is NOT filled out properly or in detail, which includes, complete plan <br /> layout, elevations (where applicable), written details of improvement being requested, including <br /> color, etc, and any other information pertinent to the processing of the request, will be returned <br /> to the Lot owner for completion before being reviewed by the Committee. <br /> 3. Committee will review requests and visit the site of the request as necessary. <br /> 4. After the Committee has approved or denied the request, it will be presented to the Board of <br /> Directors for their approval or denial. <br /> 5. There will be NO more one day approvals or last minute approvals. Request will take 7 - 14 <br /> days for appropriate review and consideration, thus giving the Committee and Board members <br /> time to review and consider the request in a thorough manner. <br /> 6. The original request will be stamped approved or denied, and after being copied the original <br /> will go into to the members file and the copy returned to the Lot owner by the Board of Director <br /> liaison to the committee. <br /> 7. The committee will follow up on requests to determine that the request as presented and <br /> approved is being adhered to. <br /> As the • er of Lot # ' 7, I understand the Property Evaluation Committee and/or the <br /> Board . f ` irectors will enter the property to follow the external progress of the construction or <br /> impro a e?t, as b 'tted on the Lot Improvement Request. <br /> k Alb- 0- - ' '4. /t 1 <br /> / 9K4 1 - i i / 2 )// 0 <br /> Lot 0 er 's Signature Date <br /> 4/03/06 <br /> s4a <br />
The URL can be used to link to this page
Your browser does not support the video tag.