Laserfiche WebLink
ZEPHYRHILLS FIRE DEPARTMENT <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Chief Keith Williams Bus (813)780 -0041 Fax (813)780 -0044 <br /> FIRE SERVICE USER FEES <br /> Occupancy No.: <br /> Plan No.: /6 9 Contractor: cl� ; 4 /✓G-'! .1/ <br /> Business Name: 1474,6 r... 4 0--___.-- Billing Address: / 7 / . <br /> Business Address: ' GQ 6:0 .5 t 1 _ l <br /> Business Phone No.: Billing Phone No.: <br /> Business Fax No.: Billing Fax No.: <br /> Contact: Contact: <br /> PLAN REVIEW FEES INSPECTION FEES _ PERMIT FEE _ FALSE ALARM FEE <br /> Site Plan N/C , Annual N/C _ Sprinkler $50 _ 1st Alarm N/C <br /> IMI Family /Commercial .16 sf , 1st Re- inspection N/C _ Standpipes $50 _ 2nd Alarm N/C <br /> (Minimum Charge °. 5.0. , 2nd Re- inspection $100 _ Fire Pump $50 _ 3rd Alarm N/C <br /> 0 Plan Revisions a BL ' 3rd Re- inspection $250 _ Hoods $50 _ 4th Alarm $100 <br /> 4th Re- Inspection $500 _ Fire Alarm $50 5th Alarm $150 <br /> SPRINKLER SYSTEMS (Business closed until _ LP Gas $50 6th Alarm $200 <br /> _ 0 - 25 Heads $50 violations corrected) _ Natural Gas $50 _ NON COMPLIANCE $150 <br /> 26 plus Heads $100 _ SPRINKLER SYSTEMS _ Fuel Tanks- per tank $50 <br /> STANDPIPE SYSTEM _ Hydro Undergrounds $45 _ Sparklers $100 <br /> D Per Riser $50 ` Hydrostatic Test $65 per system _ Fire Works $500 <br /> FIRE PUMP _ Acceptance Test $45 per system _ Camp Fire $25 <br /> 0 Per Pump $100 _ Hydrant Flow $75 _ Controlled Burn $100 <br /> FIRE ALARM SYSTEM _ Hood /Duct $50 <br /> 0 - 25 Devices $50 _ FIRE ALARM SYSTEM _ Place of Assembly $50 Annual <br /> 26 plus Devices $100 _ System Acceptance $50 _ Fire Protection $25 <br /> _ SUPPRESSION SYSTEMS — Recall Acceptance $50 — Flammable Application $50 Annual <br /> Wet $50 _ OTHER _ Waste Tire Storage $50 Annual <br /> _ Dry $50 _ Fire Wall /Smoke Wal $1 per wal _ Generator < KW $100 <br /> _ CO2 $50 _ LP Gas $25 per tank _ Generator >30 KW 150 <br /> Other $50 — Natural Gas $25 per system _ Bio -Hazard Waste $100 Annual <br /> KITCHEN EXHAUST _ _ Fumigation Tenting $50 <br /> 0 Hood /Ducts $50 _ Tent 10'x10' or greater $15 per tent — <br /> Torch Pot/Applied $50 <br /> OTHER _ Fire Pump $45 — Fire Materials $100 Annual <br /> _ LP Installation per tank $50 _ Fire Suppression $30 <br /> _ Fuel Tank Installation $50 _ System Acceptance <br /> (Per Tank) $50 _ Exhaust Hood /Duct $30 <br /> 0 Natural Gas Installation $50 _ Re - inspection DBL <br /> (Per System) (other than annual) <br /> 0 Spray Booth $50 0 Inspection scheduled DBL _ <br /> and cancelled less than _ <br /> _ 24 hours <br /> \ Construction Insp. N/C <br /> Emergency Vehicle Acs $50 FALSE ALARM <br /> PLANS TOTA INSPECTION TOTAL PERMIT TOTAL TOTAL <br /> GRAND TOTAL I &— 1 <br /> Comments: <br /> Date: /- <br /> Insg ctor: /f ne_� <br />