My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10544
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2011 2:53:33 PM
Creation date
3/22/2011 2:50:25 PM
Metadata
Fields
Template:
Building Department
Company Name
KEYSTONE CHLLENGE FUND INC
Building Department - Doc Type
Permit
Permit #
10-10544
Building Department - Name
KEYSTONE CHALLENGE FUND INC
Address
38826 4TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPEC. DESCRIPTION OF WORK LOCATION COST <br /> 78 ELECTRICAL- CONTINUED <br /> Install all required rough and finished electrical work including all <br /> , indicated wall switches, outlets, and required wiring for lights. All <br /> switches, outlets and cover plates to be white. See plan. Entire House 4,582 <br /> Purchase and install all new light fixtures and ceiling fans. This an <br /> allowance item. Entire House $800.00 <br /> 79 H.V.A.C. <br /> Install a new central heat pump heating and air conditioning system <br /> 2 1/2 tons, complete with all new ductwork, all controls and electrical. <br /> (minimum SEER required - 15.0) 10.0 KW heat strip. The tonnage to <br /> be determined by the mechanical subcontract. Install condensing <br /> unit set on a concrete (or equal) pad. Include returned air grills in <br /> all rooms shown on the plan. Entire House 6,000 <br /> Furnish and install a ConsERV high Enthalpy Energy Recovery <br /> filter to be installed in the air handler. The filter to be compatible <br /> to the unit size. Entire House 824 <br /> 80/81 PLUMBING - GENERAL SPECIFICATIONS <br /> PLUMBING FIXTURES <br /> Rough and finished plumbing work including all fixtures indicated <br /> on the plans. Work includes rough -in and connections for a cloths <br /> washer, a forty gallon electric water heater and two outside hose <br /> bibs. All work and fixtures to meet the 2010 Bid Specs. Entire House 5,500 <br /> Make all necessary utility connections to the new house. Entire House 305 <br /> 82 MAJOR APPLIANCES <br /> Install a new free standing stove, refrigerator, micro wave range <br /> hood, and dishwasher. All appliances to of the same brand. <br /> Refrigerator to be 21 cubic feet and the stove a glass top. This <br /> is an allowance item. Kitchen $2,200.00 <br /> 85 PEST EXTERMINATION <br /> Treat the house for termite protection and supple home owner the <br /> warranty. (one year) Entire House 530 <br /> 86 PAVING OF DRIVEWAY(S), WALKWAY(S), AND PARKING AREA(S) <br /> Install a new concrete driveway and sidewalks. Exterior Allow. $2,000.00 <br /> PAGE TOTAL 22,741 <br /> CUM TOTAL 94,100 <br /> DATE: 05/13/10 Keystone Challenge Fund- Case # 09 -804 PAGE: 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.