My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10544
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2011 2:53:33 PM
Creation date
3/22/2011 2:50:25 PM
Metadata
Fields
Template:
Building Department
Company Name
KEYSTONE CHLLENGE FUND INC
Building Department - Doc Type
Permit
Permit #
10-10544
Building Department - Name
KEYSTONE CHALLENGE FUND INC
Address
38826 4TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•SPEC. DESCRIPTION OF WORK LOCATION COST <br /> ;CTION A — ADDITIONAL WORK REQUIRED TO COMPLETE PROJECT <br /> THE FOLLOWING ADDITIONAL WORK MAY BE ADDED OR REQUIRED AT CERTAIN SITES. <br /> SUBMIT THE FOLLOWING ITEMS TO BE ADDED TO THE PROJECT FOR A TOTAL COST. <br /> 91 HOMEOWNER STATE HOUSING INITIATIVES PARTNERSHIP FOR NEW CONSTRUCTION <br /> ENERGY STAR - REQUIRMENTS <br /> Furnish and install energy star requirements, SHIP and HOP. Entire House 0 <br /> Permits and fees Entire Project 1,172 <br /> Tree trim as directed by the housing specialist.. Allowance House Location $ 200.00 <br /> If deed restrictions or codes require underground electric service, <br /> the added cost of this service. Entire House 0 <br /> The base price includes connecting to the city water with a meter. <br /> If a well is needed, the cost will be including all permits, fee, <br /> connections, and equipment. Entire House Allow N/A <br /> The base price includes connecting to the city sewer. If a septic <br /> system is needed, the cost for this including permits and equipment. Entire House Allow N/A <br /> Monolithic footings as indicated are assumed. Added cost for stem <br /> wall and spread footings, if required by site conditions. Entire House N/A <br /> Demo the existing structure Entire Structure N/A <br /> Surveys for permitting/final as built/elevations /site plan/layout/tie -in Entire Project 824 <br /> Drainage or site engineering. Entire Project 0 <br /> Final Fill Dirt/Grading/Compaction Entire Project Allow. $ 500.00 <br /> Shower doors. Bathrooms 575 <br /> Upgrade air condition system to 16 SEER Entire house N/A <br /> Furnish chemical toilet as required by the Building Department. Entire Job 600 <br /> PAGE TOTAL 3,871 <br /> DATE: 05/13/10 Keystone Challenge Fund- Case # 09 -804 PAGE: 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.