Laserfiche WebLink
STATE OF FLORIDA <br /> �.�..,.,, City of Zephyrhills <br /> . , _ • ; PASCO COUNTY <br /> 603 Eighth Street Zephyrhills, Florida 33599 (813) 782 -1525 <br /> September 8, 1983 <br /> Mayor <br /> Robert H. Johnson <br /> City Council <br /> )curt H. Stephenson <br /> President Lendon Investments, Inc. <br /> fames A. Bailey 2590 S.R. 584 <br /> Vice President Palm Harbor, Florida 33563 • <br /> Stan Zachowski <br /> Clyde C. Bracknell Attention: Peter L. Leahon <br /> Ray H. Rodgers <br /> City Attorney Re: Requirements for First Phase of Cedar Ridge Development <br /> Charles D. Waller g p <br /> City Manager Dear Mr. Leahon: <br /> Louie E. Holt <br /> The following items are required by the City of Zephyrhills <br /> before a Certificate of Occupancy will be issued on the First <br /> Phase construction of the Cedar Ridge project. <br /> (1) Blanket easement for utilities in the development <br /> (water & sewer) plus two sets of As -Built plans. <br /> (2) Install 8" valve at the end of existing water <br /> line or extend 8" line to fire hydrant as shown <br /> on Site Plan for future expansion. <br /> '(3) Apply for water meters for each individual office <br /> unit. <br /> (4) Water retention area must be completed before <br /> Certificate of Occupancy is issued - refer to <br /> calculation on Site Plan for First Phase. <br /> J (5) Paving of Dairy Road must be completed before <br /> \h , 0 (certificate of Occupancy is issued on First Phase <br /> (Refer to attached letter copy of March 8, 1983) - <br /> �S )uy cash $15,000.00 bond or pay the City of Zephyrhills <br /> (6) Copy of Condominium Document papers of the project. <br /> If you have any questions concerning the above requirements, <br /> please do not hesitate to contact my office. <br /> Sincerely, <br /> Bruce M. Bahr, Building Official <br /> BMB /bss <br /> cc: Louie Holt, City Manager <br /> Louie Sellars, Utilities Supervisor <br />