Laserfiche WebLink
OA - <br />2 W &V -- <br />3' 'W & 2' V <br />i' CW & 3/4' HW <br />TO SUPPLY P -3B, <br />P -IC AND P -4. <br />C 2 y <br />2' DROP THRU BOTTOM OF PLANTER <br />OVER GRAVEL BED BELOW. SEE <br />'. DETAIL ON DWG. P -6. '. <br />4 <br />I <br />-1/2' TRAP PRIMER <br />LINE (BELOW SLAB) <br />FROM P -4. <br />ti_ tL <br />3 U CL <br />ro v <br />t�(n UW <br />• W(D <br />C3(o <br />N 4 <br />U1 m <br />U0 ° <br />Q <br />H <br />U � <br />O �- <br />U) <br />co) <br />Q W <br />Lc <br />w <br />0 L <br />1-4 <br />0 W Q <br />Z <br />0 Z Z <br />F- 3 <br />• J N <br />U) N <br />�• z .i <br />y u N <br />cD <br />z <br />H <br />CID <br />ME <br />ZD <br />J <br />cl- <br />C DB- <br />MH UHAVtL btU btLUW. 5tt <br />DETAIL ON DWG. P -6. <br />1 <br />HEATER. SEE OET. <br />ON DWG. P -6. <br />T � <br />BUS IC3 co <br />3 <br />OFFICE 819 xlo <br />1 <br />1 <br />ca <br />I U D <br />VAT 1/4' PER FT <br />SLOPE (IN 2ND. FLOOR <br />CEIL. SPACE) . <br />UP TO ROOF DRAIN <br />UP TO ROOF OVERFLOW <br />rn , Qi:i mnve ui 1ruPIQ <br />1 <br />I <br />1 <br />N <br />Z <br />Q <br />CY <br />O <br />O <br />J <br />LL. <br />0 <br />0 <br />W <br />cn <br />SECOND FLOOR PLAN AREA "A" — PLUMBING <br />SCALE: 1/4' = 1' -0' <br />NOTES: <br />1. HORIZONTAL DOMESTIC WATER PIPING TO RUN IN 2ND. FLOOR CEILING SPACE <br />UNLESS OTHERWISE NOTED. <br />2. FOR SANITARY PIPING DIAGRAM, SEE DWG. P -7. <br />3. RUN i' PVC CONDENSATE DRAIN LINE IN 2ND. FLOOR CEILING SPACE. <br />SLOPE FROM EQUIPMENT AND AIR GAP INTO FLOOR DRAIN IN UTILITY AM. <br />(D <br />Z <br />H <br />O <br />H <br />m <br />W <br />U <br />H <br />LL <br />LL <br />O <br />KEY <br />SITE <br />2� <br />SUMO2PO4 <br />Q <br />U <br />H <br />0 <br />W <br />Z <br />Z <br />Cf) <br />o <br />0 <br />P -3 <br />1 <br />1 <br />CORRIDOR #C -C I <br />} 2' W & VTR <br />I <br />1/2' TRAP PRIMER 1 uj <br />LINE (BELOW SLAB) uj ui <br />cn <br />FROM P -4. <br />PLAN <br />