My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10318
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2011 9:57:19 AM
Creation date
8/15/2011 9:57:18 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10318
Building Department - Name
BACK,WILLIAM & DINA
Address
5121 19TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vi. Repair or alteration of drainage or vent piping: 6.00 <br /> vii. Vacuum breakers or backflow protective devises <br /> Installed subsequent to the installation of the piping, <br /> Or equipment served -one (1) to (5): 3.50 <br /> Over five (5), each 2.50 <br /> 8. Mechanical Permits: Minimum Permit Fee $40.00 <br /> a. For all new construction installations, the fee charged <br /> shall be $40.00, plus $10.00 per ton. <br /> b. Replacements shall be based on contract valuation price. <br /> If no contract price, fee shall then be: <br /> 400 CFM ='1 Ton <br /> 12,000 BTUs = 1 Ton <br /> c. Boilers based on BTU Input: <br /> i. 33,000 BTU (1Bhp) to 165,000 (Bhp) $ 5.00 <br /> ii. 165,001 Btu (5Bhp) to 333,000(Bhp) $10.00 <br /> iii. 330,001 Btu (10 Bhp) to 1,165,000 (Bhp) $15.00 <br /> iv. 1,165,001 Btu (52 Bhp) to 3,300,000 (Bhp) $25.00 <br /> v. Over 3,300,000 Btu $35.00 <br /> d. Solar Energy Installation: $40.00 <br /> 9. Mobile Home Permit Fees: The following shall be charged for mobile home installations: <br /> i. Mobile Home and Park Model Setup — per unit $60.00 <br /> ii. Electrical: $40.00 <br /> iii. Plumbing: $40.00 <br /> iv. Mechanical: $40.00 <br /> 10. Application Fees: $15.00 <br /> 11. Plan Checking Fees: When plans are required to be submitted, a plan <br /> review fee shall apply. The plan review fee shall <br /> be equal to one half the building permit fee. The <br /> plan review fee is in addition to the building permit <br /> fee. <br /> 12. Re- inspection Fees: For each trade: $40.00 <br /> i. Incorrect Address: <br /> ii. Condemned work resulting from fault construction <br /> iii. Repairs or corrections not made when inspection called - <br /> iv. Work not ready for inspection when called <br /> v. Permit not posted on job site <br /> vi. Plans not at job site <br /> vii. Work not accessible <br /> When extra trips are necessary due to any of the above reasons, the above referenced <br /> charge of $40.00 shall be made. <br /> 13. Re- Permitting Fees: Whenever a permit has expired, a re- permitting fee of 'A the original <br /> permit fee shall be 'paid prior to issuance of permit. <br /> 14. Time Extension: Per Trade: $15.00 <br /> One (1) 90 -day extension may be granted where no progress has been made due <br /> to a verifiable hardship. <br /> 15. Change of Contractor: For each division: $15.00 <br /> Documentation from the parties involved is required. <br /> 16. Refund on Permits: <br />
The URL can be used to link to this page
Your browser does not support the video tag.