My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10901
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2011 10:22:11 AM
Creation date
8/15/2011 10:22:08 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
10-10901
Building Department - Name
NHC-F1115 LLC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 4 underlayment: Standard Slope -4112 (333mm/m) or more 1 Underlayment: Low Slope 2/12 -4/12 (167mm- ;333mm/ r!) <br /> Application of underlayment: Cover deck with one layer of underlayment installed a Application of underlayment and eave flashing: Completely cover the deck w two <br /> without wrinkles. Use only enough nails to hold underlayment in place until covered by layers of underlayment as shown. Use only enough nails to hold underlayment in place <br /> shingles. Application of eave flashing: Install eave flashing such as GAF -Elk Weather until covered by shingles. Use blind nailing for eave fleshings. At eaves and where ice <br /> Watch', StormGuard', or other GAF -Elk Leak Barrier in localities where leaks may be caused darns can be expected, use one layer of GAF Weather Watch*, StormGuard' or other <br /> by water backing up behind ice or debris dams. Eave flashing must not overhang the eave GAF -Elk Leak Barrier. Eave flashing must not overhang the roof eave edge by more <br /> edge by more than 1/4" (6mm) and extend 24" (61Omm) beyond the inside wall line. than 1/4" (6mm) and not e <br /> ) nd extend dc ( 6 install ) beyond e of Shingle-Mate' inde walll underlayment. line. here ice dams <br /> or P 2 plies <br /> 4" (102mm)r Weat Welch", StorrGuard '', 4 " <br /> 12" (305mm) Deck or other GAF -Elk Leak Barrier (51mm to 102mm) <br /> 12" (305mm) <br /> Weather Walch StormGUard <br /> Minimum Slope. For lower slopes, see Box la �/� or other GAF -Elk Leak Barrier <br /> i 6 m� <br /> All sheets are 36" (914mm) - l \ g1 <br /> All sheets are 36" (914mm) ✓ 39"`A wide Shingle -Mate underlayment N. c el <br /> • \ or other GAF -Elk underlayment. •y69,,ACO \ l x, <br /> de Shingle- Mate"or \ \ <br /> other GAF -Elk underlayment. \ v Up to 1/4 (6mm) roof overhang : .,,psr� l -."-' <br /> / /I NZ610.`� Mtn# ' / Lap sheets <br /> 2" (51 mm side la Rake dnp edge - \ ,\,� 19 (483mm) <br /> ' ) P��! to provide <br /> t _ douhle coverage <br /> Along rake, place drip edge fop / 4" (102mm) end la (-- <br /> of underlaym ent p Up tot /4" (6mm) roof overhang Eave drip edge <br /> Along eave, put underlayment on top of metal drip edge. <br /> Z Starter Course 2 First Course <br /> Apply as shown. Note: GAF -Elk starter strips with sealant are recommended at the e. Start and continue with full shingles laid flush with the starter course. Shingles may be laid <br /> eaves and rakes for best performance and required for the best limited wind warranties from left to right or right to left. DO NOT lay shingles straight up the roof (racking) since this <br /> on certain products (see limited warranty for details). procedure can cause an incorrect color blend on the roof and may damage the shingles. <br /> Place shingles close Ingethet <br /> Slarl at either rake and lay in either direction but don'1 c rowd <br /> Continue with full - length <br /> Non - corroding trimmed shingles Starter Course <br /> Meal Drip \ � <br /> Edge / egvl <br /> L J� e�men� / / , day \2 0 <br /> Continue <br /> Place shingle 114' -3r4' (r5t tours¢ <br /> rG,,tse (6 d9ake ledver save . with whole <br /> For maximum wind resistance along rakes, Install any 5 . N containing or to prcvitle tln First Cours <br /> shingles to underlayment and d each other in a 6' If not using a pre -cut I (702mm) width of asphalt plastic cement. starter tabs off NI* ` <br /> all starter ar c coursurs e shingles Star( first course with whole Shingle <br /> Trim 6" (152mm) l07' (176mm) from end of first shingle then place and nail as placed 1/4" -314' (6 -19mm) over save <br /> to 1 02, l 4' ( and rake edges to provide drip edge. <br /> to 02mrn mj 1 from s save ave <br /> I <br /> 4 Second Course 5 Third Course <br /> Start and continue second course as shown. Trim 6" (152mm) from the end of the Trim 11" (279mm) from the first shingle in the course; then continue with full shingles <br /> shingle. Position the shingles in the second and subsequent courses flush with the tops across the roof. Strike a chalk line about every 6 courses to check parallel alignment <br /> of the wide cut -outs. This results in a 5" (127mm) exposure. Continue with full width with eaves. NOTE: Shingles may be laid from either left or right -hand side. <br /> shingles across the roof, <br /> e�' <br /> deg \a9 <br /> of <br /> Third Course ' . �. � Second Course \,L � gd `� : , ' .� First Course Trimmetl Shingles , <br /> Trim Shingles <br /> 6" (152mm) <br /> Fourth Course and Remaining Courses ' Hip and Ridge <br /> 6 <br /> Trim 17" (432mm) from first shingle in the course, then continue with full shingles Install GAF -Elk Timbertex ", Z "Ridge, Seal -A- Ridge ", or Ridglass hip and ridge shingles <br /> across the roof. Fifth and subsequent courses; repeat Steps 3 through 6. (check regional availability).Follow the application instructions shown on the hip and <br /> ridge wrapper. <br /> Fifth Course <br /> Full Shingle <br /> Fourth Course 111' 41111i <br /> Trimmed Shingles v , v pl .. ' <br /> a' \ <br /> tic <br />
The URL can be used to link to this page
Your browser does not support the video tag.