, 41:,,,,,,, <br /> BIAN O CONSTRUCTION <br /> PRO OSAL/CONTRACT <br /> biancobuiliing.com <br /> August 30,12010 <br /> , <br /> Between Charles Moulton <br /> 6929 Stephen's Path <br /> Zephyrhills, Fl 4 <br /> - 813- 469- 7065(ce8) <br /> 813- 779 -9513 <br /> And the Contractor: BIANCO CONSTRUCTION <br /> CBCO602oi <br /> 15147 MYRTLE ST <br /> DADE CITY, FL 33523 <br /> 352 -567 -9029 <br /> 4 g fr <br /> ' For the 1 • PROJECT: Legal Exteusion <br /> + a- , r above neentioneot. <br /> �� �V� x,, MArgwAs OR LABOR listed bow � - the d Project. <br /> F <br /> Extend .:. M Lanai Approx. 130 Sq Ft ^, <br /> Extend " , Room To Accommodate Concrete Extension <br /> Reuse Existing Door And Screen Wall (If Possible) <br /> Texture Floor To Match Closely As Possible With Fwristing <br /> Labor And Materials $420040 <br /> *Includes: Fill Dirt, Plans, Engineering And Permits <br /> Clean Up Of All Debris And Rerouting Of Sprinkler If Necessary+ <br /> .., *Owner To Provide Survey Or Pica Pin <br /> proposal shell be valid for 20 days. <br /> This price does not reflect any hidden structural defects, termite damage, wood rot, or der <br /> defe+ckive cm ponents of the existing house which may need td be repaired or replaced in order to <br /> properly complete the above- quoted work, and further acknowledge that the expense, if any, will i <br /> be the responsibility of the property owner. <br /> A r is any change to the original plans and/or specifications. All change orders <br /> to agreed upon in writing, including cost, additional time considerations, approximate t <br /> dates whey the work will begin and be completed, a legal description of the location where the <br /> work will be done and signed by both parties. NO extra work will be started or special order <br /> items ordered until the extra worklchange order sheet has beet} si '2 . by all parties, contractor, <br /> owner anc subcontractor (If applicable) and payment in full for + I e additional work to be done or <br /> special order items) ordered. <br /> 1. YM01SCHfU <br /> % Before Commencement Of Project $1000.00 ,a <br /> Upon Receipt of Permits. ..$2000.00 A <br /> Upon Completion of Project S1200.00 <br /> . ,4j <br /> Peter Bianco Construction, Inc, The Contractor shall promptly pay all sums owed to : a <br /> laborers, subcontractors, and material -men who supply labor and/or materials for the work <br /> and shall indemnify, hold harmless, and defend the owner and the property on which the <br /> work is located from mechanic's and material-men's bens. The contractor will furnish a <br /> field lien w • r s -, days after final payment received. n <br /> RESPEC . .D <br /> � <br /> Signature (,P /� dba, Peter Bianco Construction, Inc. <br /> Date: lc� <br /> ACCEPTANCE AND CONTRACT <br /> THE ABOVE PRICES, SPECIFICATIONS, TERMS, AND CONDITIONS ARE <br /> SATIFACTORY AND ARE HEREBY ACCEPTED. PETER BIANCO CONSTRUCTION, <br /> INC. IS HEREBY AUTRHORIZED TO PERFORM THE WORK AS SPECIFIED. PAYMENT <br /> SHALL BE MADE AS OUTLINED ABOVE. I/WE FURTHER ACKNOWLEDGE THAT WE <br /> HAVE RECEIVED AND REVIEWED THE FOLLOWING NOTICES: <br /> BUYER'S RIGHT TO CEL/NOTICE TV THE OWEVER/LIENS <br /> r ' Accepted 1 � <br /> Owner Date a—�,� u <br /> 6 ;d; <br /> mo <br /> Owner Siinatur4U Date ' <br /> i <br /> 1 <br /> x <br />