<br /> BIAN O CONSTRUCTION
<br /> PRO OSAL/CONTRACT
<br /> biancobuiliing.com
<br /> August 30,12010
<br /> ,
<br /> Between Charles Moulton
<br /> 6929 Stephen's Path
<br /> Zephyrhills, Fl 4
<br /> - 813- 469- 7065(ce8)
<br /> 813- 779 -9513
<br /> And the Contractor: BIANCO CONSTRUCTION
<br /> CBCO602oi
<br /> 15147 MYRTLE ST
<br /> DADE CITY, FL 33523
<br /> 352 -567 -9029
<br /> 4 g fr
<br /> ' For the 1 • PROJECT: Legal Exteusion
<br /> + a- , r above neentioneot.
<br /> �� �V� x,, MArgwAs OR LABOR listed bow � - the d Project.
<br /> F
<br /> Extend .:. M Lanai Approx. 130 Sq Ft ^,
<br /> Extend " , Room To Accommodate Concrete Extension
<br /> Reuse Existing Door And Screen Wall (If Possible)
<br /> Texture Floor To Match Closely As Possible With Fwristing
<br /> Labor And Materials $420040
<br /> *Includes: Fill Dirt, Plans, Engineering And Permits
<br /> Clean Up Of All Debris And Rerouting Of Sprinkler If Necessary+
<br /> .., *Owner To Provide Survey Or Pica Pin
<br /> proposal shell be valid for 20 days.
<br /> This price does not reflect any hidden structural defects, termite damage, wood rot, or der
<br /> defe+ckive cm ponents of the existing house which may need td be repaired or replaced in order to
<br /> properly complete the above- quoted work, and further acknowledge that the expense, if any, will i
<br /> be the responsibility of the property owner.
<br /> A r is any change to the original plans and/or specifications. All change orders
<br /> to agreed upon in writing, including cost, additional time considerations, approximate t
<br /> dates whey the work will begin and be completed, a legal description of the location where the
<br /> work will be done and signed by both parties. NO extra work will be started or special order
<br /> items ordered until the extra worklchange order sheet has beet} si '2 . by all parties, contractor,
<br /> owner anc subcontractor (If applicable) and payment in full for + I e additional work to be done or
<br /> special order items) ordered.
<br /> 1. YM01SCHfU
<br /> % Before Commencement Of Project $1000.00 ,a
<br /> Upon Receipt of Permits. ..$2000.00 A
<br /> Upon Completion of Project S1200.00
<br /> . ,4j
<br /> Peter Bianco Construction, Inc, The Contractor shall promptly pay all sums owed to : a
<br /> laborers, subcontractors, and material -men who supply labor and/or materials for the work
<br /> and shall indemnify, hold harmless, and defend the owner and the property on which the
<br /> work is located from mechanic's and material-men's bens. The contractor will furnish a
<br /> field lien w • r s -, days after final payment received. n
<br /> RESPEC . .D
<br /> �
<br /> Signature (,P /� dba, Peter Bianco Construction, Inc.
<br /> Date: lc�
<br /> ACCEPTANCE AND CONTRACT
<br /> THE ABOVE PRICES, SPECIFICATIONS, TERMS, AND CONDITIONS ARE
<br /> SATIFACTORY AND ARE HEREBY ACCEPTED. PETER BIANCO CONSTRUCTION,
<br /> INC. IS HEREBY AUTRHORIZED TO PERFORM THE WORK AS SPECIFIED. PAYMENT
<br /> SHALL BE MADE AS OUTLINED ABOVE. I/WE FURTHER ACKNOWLEDGE THAT WE
<br /> HAVE RECEIVED AND REVIEWED THE FOLLOWING NOTICES:
<br /> BUYER'S RIGHT TO CEL/NOTICE TV THE OWEVER/LIENS
<br /> r ' Accepted 1 �
<br /> Owner Date a—�,� u
<br /> 6 ;d;
<br /> mo
<br /> Owner Siinatur4U Date '
<br /> i
<br /> 1
<br /> x
<br />
|