My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11124
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-11124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2011 10:17:38 AM
Creation date
8/16/2011 10:17:37 AM
Metadata
Fields
Template:
Building Department
Company Name
EILAND PARK TOWNHOMES
Building Department - Doc Type
Permit
Permit #
10-11124
Building Department - Name
US HOMES CORP - LENNAR
Address
37542 DALIHA TERR BLDG 21 #203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> Original Permit # 6009 <br /> Home Address 37542 Daliha Terr, Zephyrhills, FL 33542 <br /> Construction Value: $30,478.00 <br /> Pre - Demolition <br /> • Disconnect electric panel from home <br /> • Keep one (1) GFI outlet in garage only for irrigation, pool (if needed) and power <br /> for repairing home <br /> • Turn off gas line in home (if needed) <br /> • Remove existing outlets and switches from electrical boxes <br /> Demolition :r1 v �. IC- <br /> • Remove selected drywall � -�_ � � � , /, <br /> t <br /> • Remove insulation (except foam insulation against blo' ?ny 0._ <br /> • Remove/Repair any damage to existing studs SJ 0 �`1 <br /> • Remove cabinets, countertops and fixtures as necess a / <br /> • Remove tubs, commodes, sinks and hot water heater 01 <br /> • Remove all appliances as necessary <br /> • Remove all duct work and air handler, refrigerant lines and HVAC grills <br /> • Remove flooring -tile, carpet, hardwood, etc. as needed <br /> • Remove all interior doors and trim, mirrors and shower doors as needed <br /> • Remove /repair any copper damaged by drywall <br /> • Remove all switches and outlet plates <br /> • Note: during demolition we will bring home back to rough -in mechanical, <br /> electrical and plumbing stage. No structural changes will be made in home. <br /> Mechanical Scope of Work <br /> • Re- install all new trunk lines and duct work per what is in existing home <br /> including bath fans <br /> • Replace interior compressor unit <br /> Plumbing Scope of Work <br /> • Repair and replace any damaged copper <br /> • Install new copper after removal as necessary <br /> • Install new tubs and fixtures as necessary ` <br /> • Repair and replace any damaged copper ,, ° <br /> • Install new copper after removal as necessary t <br /> Page 1 of 2 <br /> Lightwave Drive, Suite 210 Clearwater, FL 33760 • Phone: 727 - 479 -1700 • Fax: 727 - 479 -1707 <br /> LENNIAR.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.