My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11125
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-11125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2011 10:18:36 AM
Creation date
8/16/2011 10:18:35 AM
Metadata
Fields
Template:
Building Department
Company Name
EILAND PARK TOWNHOMES
Building Department - Doc Type
Permit
Permit #
10-11125
Building Department - Name
US HOMES CORP - LENNAR
Address
37554 DALIHA TERR BLDG 21 #209
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> Original Permit # 6015 <br /> Home Address 37554 Daliha Terr, Zephyrhills, FL 33542 <br /> Construction Value: $26,587.00 <br /> Pre - Demolition <br /> • Disconnect electric panel from home <br /> • Keep one (1) GFI outlet in garage only for irrigation, pool (if needed) and power <br /> for repairing home <br /> • Turn off gas line in home (if needed) <br /> • Remove existing outlets and switches from electrical boxes <br /> Demolition <br /> • Remove selected drywall <br /> • Remove insulation (except foam insulation against block wall) if any <br /> • Remove/Repair any damage to existing studs - 10‘ C <br /> bi ‘` "�. <br /> • Remove cabinets, countertops and fixtures as necessary k b i 14 -- <br /> • Remove tubs, commodes, sinks and hot water heater f <br /> • Remove all appliances as necessary "; <br /> • Remove all duct work and air handler, refrigerarliin'es and'�VAC grills <br /> • Remove flooring -tile, carpet, hardwood, etc. as nee dui <br /> n <br /> • Remove all interior doors and trim, mirrors and shower doors as needed <br /> • Remove /repair any copper damaged by drywall <br /> • Remove all switches and outlet plates <br /> • Note: during demolition we will bring home back to rough -in mechanical, <br /> electrical and plumbing stage. No structural changes will be made in home. <br /> Mechanical Scope of Work <br /> • Re- install all new trunk lines and duct work per what is in existing home <br /> including bath fans <br /> • Replace interior compressor unit <br /> Plumbing Scope of Work <br /> • Repair and replace any damaged copper <br /> • Install new copper after removal as necessary <br /> • Install new tubs and fixtures as necessary <br /> • Repair and replace any damaged copper <br /> • Install new copper after removal as necessary.. r , <br /> Pagelof2 <br /> n LA <br /> 15550 Lightwave Drive, Suite 210 Clearwater, FL 33760 • Phone: 727 - 479 -1700 • Fax: 727 -479 -1707 Q <br /> LEIVNAR.COI1/1 e„• <br />
The URL can be used to link to this page
Your browser does not support the video tag.