Laserfiche WebLink
39616 South Ave <br /> Plan Review Comments: <br /> 1. F.F.E. shall be a minimum 8" above road elevation or to the engineered site <br /> plan. <br /> 2. Tie -in survey required before pre -slab inspection to show elevation. <br /> 3. Compaction test required. <br /> 4. All property markers to be exposed before first inspection. <br /> 5. All glazing requirements to be met per chapter 24 of the F.B.C. <br /> 6. All means of egress are to be per chapter 10 of the F.B.C. <br /> 7. No plumbing, mechanical, electric, or framing shall be cover with inspection <br /> first. <br /> 8. Inspection and approval shall be done before any concrete is poured. <br /> 9. All handicap and A.D.A. codes and requirement shall be met. <br /> 10. All welds, if any, shall be inspected by an independent engineering company, <br /> and a copy of their report shall be given to the building department. <br /> 11. Water heater will require expansion tank. <br /> 12. "As built" plan will be required before final. <br /> F.F.E. — Finished Floor Elevation <br /> F.B.C. — Florida Building Code <br /> A.D.A. — Americans with Disabilities Act <br />