My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11362
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2011 9:10:43 AM
Creation date
10/17/2011 9:10:31 AM
Metadata
Fields
Template:
Building Department
Company Name
PINE CREST M.H.P.
Building Department - Doc Type
Permit
Permit #
11-11362
Building Department - Name
NELSON,GAIL
Address
6028 MINERVA ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ELIXIZ <br /> E INDTJSTRIE <br /> Installation Instructions for <br /> ELIXIR Regular Outswing Doors <br /> SIZE AND ROUGH OPENING <br /> Elixir Regular Outswing doors, series 200 (prepainted steel skins), 300 (vinyl <br /> steel 6 -panel skins), & 400 (vinyl steel skins), are designed so that the rough opening <br /> dimensions are the same as the call size. (Tolerance -0, +1/4 ") <br /> Example: If a rough opening is 34" x 76 ", order a 34 x 76 door. <br /> INSTALLATION <br /> Be certain the floor is level and that the rough opening is square before <br /> attempting installation. <br /> 1. Make certain all mounting surfaces (siding seams included) are securely <br /> fastened and flat around the perimeter of the rough opening. There should be <br /> no obstructions in the opening (i.e. metal straps, belt rails, etc.). <br /> 2. Apply sealant tape to the backside of the door's mounting flange, covering all <br /> screw holes. <br /> 3. When installing the door lock, place the seal on the exterior side of the door, <br /> and position the door lock where the teeth of the key are pointing up when <br /> inserted into the lock. The drain hole will be at the bottom when installed <br /> properly. <br /> 4. Do not o • en the door or remove shi i • in cli s s or shims before <br /> installation. Opening the door before installation will destroy the proper <br /> squaring of the door. If shims are not in place, position one shim at the <br /> bottom of the door between the core and the frame. Position the other shim <br /> near the striker plate between the core and the frame. <br /> 5. Insert the door assembly carefully into the rough opening. Make certain the <br /> door sill is secure on the floor and that the frame is NOT twisted. <br /> 6. Fasten the door with screws using the following method. Drive six screws <br /> into the outer frame. Drive one in the middle, top, and bottom of the hinge <br /> side; then do the same on the lock side. At this point, open and close the door <br /> to check the sealing and workability of the door. After this check, install the <br /> remainder of screws. <br /> 1 Updated 08/05/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.