My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11473
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 1:42:46 PM
Creation date
10/19/2011 1:42:44 PM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
11-11473
Building Department - Name
MAJESTIC OAKS LLC
Address
39510 VALDERRAMA LN LOT 210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-03/27/2007 15:43 6705745700 BRIAN VALENTE PAGE 01 <br /> + �� V. - T N C/ .. ` <br /> n <br /> 1 . L <br /> t t F r e ••, ' °L AM TECHNOLOOt86, iNC. j <br /> r °� - � i FLORIDA INBTALI AT10N IN$TRUCTIO F OR THE .. .. <br /> t NO, 15898 cn ' * a MOM — tier-1r tames 1.18N J <br /> r , <br /> *; ; Roo tlOt- L"V"LUNONVOIVAL war : <br /> M <br /> FOLLOW STEPS 14 <br /> � '; tATI* OF :1.v. FOR ADDINGLATPR1t ARM: <br /> — qr r . STAUr 4 Follow Maps 1D• IS e►xIiNEE+tB STAMP <br /> ' <br /> 1. S - - ' 4 ' -. ' •'1 I: . ar 1 ES: if the fcNOwirig cOndi6Ons occur - STOP? Contact Myer T- , . . ., :. /- 9OG284 -7437 <br /> a) Pier -... . s 4r b) Length of home exceeds 76 c) Root eaves exceed 18 el) Sldewell height exceed tiff , <br /> e) Locatk?n le within 1500 feet of coast <br /> 2. Remove rests art* debris in en approxlaille two foot square to expose arm son for each ground pen (C) . <br /> 3. place grobnd pan (C) directly below chassis i -beam . Press or drive pen firmly into boll until hush with or below soil. <br /> SPECIAL I140TE: The longitudinal 'V" brace system serves es a pier under the horse and railed i be loaded as any <br /> other pier_ Iit is recommended that after lei piers, and one -half inch (1Q1 before home is lowered completely on <br /> to piers, complete steps 4 through 9 below. <br /> NOTE: WHEN INeTALUNG Tt4E Heat"Y" LoaromariAL STET 1 iL.t A MNN1MU M t7F 2 SYSTEMS PER FLOOR SECTION la <br /> REQUIRED_ SOIL 1 PROSE SHOULD all USED TO OETERMMIR CORRECT TYPE OF ANCHOR FIR - SOIL CLASSIFICATION. IF PROSE TEST <br /> READINGS ARE NNTWEEN 173 a 2T6 A 1 FOOT ANCHOR MUST BE USED. IF PROSE TEST READINGS ARE BETWEEN 271111 NO A 4 FOOT ANCHOR <br /> MAY BE USED. USE GROUND ANCHORS iMTH DIAGWIAL TIES AND STABII,RER PLATES EVERY I'4" . VERTICAL LIES ARE ALSO REQUIRED ON <br /> NOME'S SUPPLIED yin's VERTICAL TIE CONNECTION NPOlfS (PER FLORIDA REG.) . <br /> 4. Select the correcd square tube brace (E) length for set - up (pier) height at support location. (Tile 18" tube is always <br /> used es the bottom part of the longitudinal arm). Note: Either tube can be used by its U, cut and drilled to length as long as a <br /> 40 to 46 degree angle is maintsktied. <br /> PiER HEIGHT 1,25" ADJUSTABLE 1.50" ADJUSTABLE <br /> (Approx. 45 degrees Mex ) Tube Length Tube Length <br /> 7 314" to 25' 22" 18" <br /> 24 3/4" to 32 114" 32' 18" <br /> 33 „ to41" 44" ifr i <br /> — _ 40"toa8" 16" . <br /> 5. Install (2) of the 1.50" square tubes (E {Ur tile}) into the "U" bracket (J), insert carriage bolt and Wave nut loose for flrial <br /> adjustrnar t. <br /> 6. Pt6cii 1 -beam connector (F) loosely on the bottom flange of the i -beam. <br /> 7. Slide the selected 1.25" tube (E) into a 1.50" tube (E) and attach to I-beam connOcbra (F) end fasten loosely *Si bolt and nut. <br /> 8. Repeat steps 6 through 7 to create the "1P' pattern of the square tubes loosely In place. The angle is not to exceed 45 <br /> degree end not below 40 degrees. <br /> 8. After ea bans are Veered, ,'ed, setxve 1.25" and 1.50" tubes using tour(4) 114 " -14 x 3f4" self-tapping screws M pre d Hued holes. <br /> iLiISTAU ATOM f L4BOW, I E oc <br /> THE 10DEL 1101 "V" (LONGITUDINAL & LATERAL PROTECTION) ELMISIATE5 THE NESU FOR MOST ITASILt2ER PLATES & FRAME TIES. <br /> rotor FOOT (4') **outdo "meson MAY aft MX4EPT WHERR THE HQ , MANUFACTURER ; 8PECIFI55i DIFFERENT <br /> 10. install remaining vertical tie-down straps and 4' ground anchors per home marrufacparers instructions. po7i: Centerline <br /> anchors to be atzsd e000rding to soil torque condition. Any mantlfecturer's specifications for cdeweli anchor loads in excess of <br /> 4,000 lbs. require a 5' anchor. <br /> 11. emir Esoh system is reeked to have a heem tie and stabilizer attached at each Wasn't enm stabiizing location. This frame tie & <br /> stabilizer plats needs to be roosted within 18" horn of Center ground pan. <br /> 12. Select the correct square tube braes (H) length for sebup lateral transverse et support bastion. The lengths come in either 60" <br /> or 72" lengths, (With the 1.30" tube as the bottom tube, end the 125" tube as the inserted tube.) <br /> 13. Insist the 1.50 transverse brace (H) to the ground Iran connector (0) with brit and nut. • <br /> 14. Side 1,26" transverse brace into the 1.50' brao8 and attach to adjacent t-bearn corxrector (1) with bolt enC nut. <br /> '1 b. bastun) 1.6u" C SITS to 1.15" V n*verse arm using tatty' 14) 14- prS Zi no16S - -- <br /> • ei� vvs n <br /> MMIUPACTIN!> o maims Fans:y*11m sTionne Telephone: ihr 931 - 79545913 <br /> A 0 OF OLIV TECHNOLOGIES,, AsC. Fax: 991-79Q -lh81 t <br /> 1-1300.284.7437 www.oltvertacimOtegiee.wrn <br />
The URL can be used to link to this page
Your browser does not support the video tag.