Laserfiche WebLink
I�DDIA <br /> ..�......��. <br /> Florida Hospital - Observation Area <br /> budget proposal <br /> January 19, 2010 <br /> Print Copies / Reproductions $ 1,800 <br /> Builders Risk Insurance by owner <br /> Building Permit / Impact Fees / Gov. Fees by owner <br /> Temporary Facilities $ 5,000 <br /> Supervision $ 40,000 <br /> Clean up / Hauling $ 8,500 <br /> PayrollOverhead $ 35,000 <br /> Temporary Walls / Dust Control $ 16,500 <br /> Final Cleaning $ 3,400 <br /> Dumpster by owner <br /> Misc. Cutting / Patching $ 12,000 <br /> Millwork $ 28,750 <br /> Rough Carpentry $ 11,500 <br /> Rough Materials $ 13,000 <br /> Roof Penetrations / Patching N.I.C. <br /> Finish Trim $ 5,000 <br /> Insulation $ 3,500 <br /> Storefront $ 4,500 <br /> Doors / Frames 8� Hardware $ 13,500 <br /> Door & Hardware Installation $ 1,100 <br /> Metal Studs / Drywall $ 17,200 <br /> Painting $ 5,800 <br /> Acoustical Ceiling $ 8,000 <br /> Floorcovering $ 24,700 <br /> Cubicle Tracks / Curtains by owner <br /> Misc. Accessories $ 12,000 <br /> Fire Extinguishers $ 2,400 <br /> Plumbing / Medical Gas $ 65,000 <br /> Fire Sprinkler Relocation $ 10,000 <br /> HVAC $ 32,500 <br /> Electrical / Fire Alarm / Low Voltage $ 175,000 <br /> Subtotal $ 555,650 <br /> CM Fee $ 19,350 <br /> TOTAL $ 575,000 <br /> not included in the above budget: <br /> permit, impact, utility or any other governmental fee <br /> security system / cctv <br /> electronic door hardware, magnetic locks, automatic door openers <br /> Page 1 of 1 <br />