My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11575
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2011 1:29:15 PM
Creation date
10/31/2011 1:29:14 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
11-11575
Building Department - Name
EMERALD POINTE RV RESORT
Address
39602 AMETHYST WAY LOT 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,--'"�. <br /> .. <br /> �.�.. - �b <br /> Procedur� for Lot Im�r:ovement Rcquests <br /> (Please r.ef�r to "Rules and Regulatio�is') <br /> 1. �il reQuests a�e to go to Chairman of the Property Eva�uation Committee, for tbe committee <br /> . to re�►iew. 1'��re is � �� �► <br /> �he Libruv bv �� Proeertv E�ndpstion committee. <br /> 2• Any r�qwest whiah is NOT fillad.out properly or in detail; which includes, comp�ete.plan <br /> layout, eleva�ons (where applicable), written details of unprovement being requested, incl�din� <br /> color, ebc, and any other informat�on per�nent to t�ie processimg of the request, �ill 6� r�rrn�d <br /> � � ��#;���� �..�e ("r�.Km:t�� . <br /> 3. Commitpe� vvill review requests and visit the site of the request as necessaiy. <br /> 4. After #he Comm�ittee has appmved or denied t�e request, it will be Rresented tQ the Board af <br /> Directors for their approval or deaial. <br /> 5• Ther� will be NO more one day approvals or last minute approvals. Request wi�l take 7.14 <br /> days for aPP�P� �'evi,ew and cons�deration, thus giving the Committee a,nd Board meinbcrs <br /> �e ��wicv�' aad consider the request in a thorough maaner. <br /> 6. The ori8inal raquest will be stamped aFP�ved or.denied, and after being copied the original <br /> � g° �t0 �o the members file and the copy retur.ned to the Lot owcner by the Board of Director <br /> liaison to the commitpee. <br /> �. The conunittee will follow up on requests to detemune that the request as presented and <br /> approved is being adhered to. <br /> e l� � �- , <br /> As t�e ov4►uer of Lot # I� understa,nd the Pm <br /> B9ard of Directors. yvill ent�r the P�' Evaluation Commi�tee and/or the <br /> pinP!�y io follow the externa1 pm�ss of the co�ucb� or <br /> imProvem�, as submitted on the Lot Improvement Rcquest. <br /> , ,G� 1P-J- ��. � _ 2 � .-- t � <br /> Lot pwncr's Sig�u� <br /> Date <br /> _ 4I03/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.