My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11241
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2011 8:28:18 AM
Creation date
12/15/2011 8:22:07 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
11-11241
Building Department - Name
MAJESTIC OAKS
Address
3834 QUAKER RIDGE ST LOT 128
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . <br /> � must follow Factory Mutual's suggested guidelines. <br /> � The longest dimension of the insulation should run PARALLEL to the flutes of a steel deck and <br /> PERPENDICULAR to the direction in which the Mule-Hide field sheet will be unrolled. Regardless of <br /> the approved lay of the insulation board, the membrane field sheet direction must be proper with <br /> respect to the deck construction, as explained in "Installing Membrane - Field Sheet Membrane," be.low. <br /> Lay no more new insulation than will be covered by the roofing membrane on the same day. Work on ' <br /> any given area of the roof m ust be made completely watertight at the end of each workday. � <br /> Good roofing practice dictates that care can be taken to achieve smooth transitions between insulation 'I <br /> i boards and roof areas. Always consider proper drainage and adjust thickness to achieve. The <br /> � membrane should never have to bridge an area and transitions should never cause ponding. <br /> i <br /> Installing Membrane <br /> � <br /> Perimeter Half Sheet I <br /> i <br /> To ensure that your installation meets the Mule-Hide specifications, refer to Standard Details as you f <br /> read this section. � <br /> I <br /> CAUTION: Keep the protective packaging of the Mule-Hide Heat-Weld Membrane intact until ready to � <br /> use. <br /> I <br /> NOTE: Half-sheets are 40.5 in wide; field sheets are 81 in. wide. The field sheets must always be � <br /> installed perpendicular to steel deck flutes, plywood deck joints, or deck plank direction, ad appropriate. <br /> All field seams shall be shingled with the flow of water. � <br /> 1. Install the first perimeter half-sheet. Roll out the first half-sheet of inembrane along one edge of <br /> the work area. This edge should be arallel to the direction in which th �' <br /> p e field sheets wtll run. I, <br /> Overlap the fascia with one edge of the roll, extending the membrane over the edge of the roof, <br /> past where the clip for the metal fascia is to be fastened. Allow the membrane to relax at least 15 I' <br /> minutes prior to fastening, 30 minutes when temperatures are below 60°F. Fasten the membrane <br /> tot he vertical surface with corrosion-resistant ring shank cap nails (or other appropriate fastener <br /> when a nailer is not available) at 12 in O.C. <br /> NOTE: Face Nailing is not acceptable into less than nominal 2x (e.g., 2 x 6 in.) wood nailers. ' <br /> On the roof surface, note the position of the edge of the half-sheet, and then fold back the first half- I ' <br /> sheet until the folded edge is roughly even with the roof edge. il� <br /> �f <br /> 2. Install the second perimeter half-sheet. Unroll the second half-sheet roll of inembrane so that it i�, <br /> laps under the unfolded edge of the first half-sheet 5 inches. This will produce a 2 to 2-1/2 in. clear ! <br /> lap area for seam welding. As with the first sheet, allow the membrane to relax at least 15 minutes '� <br /> prior to fastening, 30 minutes when temperatures are below 60°F. Install the appropriate Mule- I � <br /> Hide fasteners in the second half-sheet at the spacing specified for the particular deck type, utilizing <br /> the "set-pattern" (blue markings spaced 6 in. apart) scribed on the membrane. If still in doubt about i <br /> fastener spacing or other aspects of this operation, consult your Mule-Hide technical Service � <br /> department. ;; <br /> NOTE: Consult Fastener Guidelines Section 5 for determination of " " I <br /> ( ) _ perimeter and fastener spacing. I <br /> 3. Fold back the unfastened edge of the second half-sheet. � <br /> Field Sheet Membrane �F <br /> C ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.