My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11366
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2011 8:33:12 AM
Creation date
12/15/2011 8:29:41 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
11-11366
Building Department - Name
WEISS,THEODORE
Address
5102 7TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Change Orders <br /> � Owners may at any reasonable time during the progress of the work, by an order <br /> in writing, agreed to and signed by both parties, make any alteration to the plans <br /> and specifications, and the work shall then be executed according to conformance <br /> with an executed Contract Change Order. Any change from the signed plans and <br /> specifications must be in writing and must be paid for at the time the change is <br /> agreed upon. If the change is a deletion the amount shall be credited against the <br /> final payment. There will be a$250.00 administration fee for each change order. <br /> Commencement Date and Protection <br /> • The contract amount has been determined as of the Contract date. Because of <br /> periods of inflation in the building industry, Builder will only guarantee that <br /> amount for 45 days from Contract date. If any problems arises which delays <br /> commencement through no fault of Builder, there may be an additional amount <br /> added to contract. This figure will be determined at the time that construction <br /> commences. At that time, if Builder requests a price increase in writing, Owner <br /> has the firm option of canceling the Contract by a letter in writing to Builder <br /> within ten (10) calendar days from the date increase is requested. <br /> Subcontractors <br /> • Ryman Construction has built a solid reputation on quality construction and <br /> timely completion, and we have built a long standing relationship with the most <br /> qualified subcontractors in our area, Ryman Construction, Inc./Ryman <br /> Construction of Florida, Inc., will not allow any outside subcontractors to work on <br /> our site. There are no exceptions! <br /> Mold <br /> • Mold is a naturally occurring growth that may have adverse health consequences <br /> and which requires certain preventative and proper maintenance actions by the <br /> buyer. Accordingly, contractor assumes no liability whatsoever from any harm to <br /> individuals and damages to property arising as a result of mold unrelated to <br /> construction defects. <br /> �,,,...,..,�„ .,,.,,.,:.,�� ,.,.���. <br /> � <br /> > > <br /> �1,.,,, +o„ ., ,�+ !1 !lo%l „ « tL.o .. «,+«.,..�.,,-�� ..�,�+� � ,- � �t +L�v ��,-„0 41,�� <br /> �� > > > <br /> � <br /> +„ +L. o (',.„+,-., ..+ D.-: ,, o <br /> Initial <br /> Initial <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.