My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10908
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2012 11:49:04 AM
Creation date
2/7/2012 11:48:53 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYRHILLS COLONY
Building Department - Doc Type
Permit
Permit #
10-10908
Building Department - Name
GRAND RESERVE APARTMENTS LTD
Address
38607 VALLEY OAKS LP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U N IVE RSAL <br /> ENGINEERING SCIENCES, INC. <br /> Consultants in: Geotechnical Enginee�ing • Environmental Sciences <br /> Construction Materials Testing • Threshold Inspection • Private Provider inspection <br /> 9802 Palm River Road • Tampa, FL 33619 • Ph (8131740-8506 • Fax (813) 740-8706 <br /> May 24, 2011 <br /> First Florida, LLC <br /> 1522 Sunset Drive <br /> Suite 150 <br /> Miami, Florida 33143 <br /> Attention: Mr Allen Walker <br /> Reference: Material Conformance Letter <br /> Grand Reserve Apartments - Building Pads <br /> 38576 (Building #3) apts. 101-114, 201-214, 301-314 <br /> Permit#: 10904 <br /> UES Project No. 0810.1000105.0000 <br /> Dear Mr. Walker: <br /> This will verify that Universal Engineering Sciences, Inc. was retained by you to provide inspection and <br /> testing services during the construction of the Grand Reserve Apartments in Zephyrhills, Florida. We <br /> provided professional observation and materials testing services, and have made every reasonable effort <br /> to ascertain whether the building pad fill material and subgrade soils beneath the foundation footings <br /> along with the cast-in-place concrete were constructed in general conformance to the approved project <br /> specifications. <br /> We have employed testing procedures to assess general compliance with the project requirements. We <br /> do not undertake the guarantee of the work, nor do we relieve the contractor of their responsibility to <br /> produce a completed project conforming to the contract plans and specifications. <br /> To the best of our knowledge, the work at the subject site to date has been constructed in general <br /> conformance to the letter and intent of the project plans, to include compaction verification of the building <br /> pad structural fill material, subgrade soils beneath the foundation footings by in-place density testing. In <br /> addition, we conducted methodical sampling of the cast-in-place concrete for compressive strength <br /> verification at 7 and 28 days of age. <br /> We appreciate having had the opportunity to provide materials testing services for this project. Please do <br /> not hesitate to contact us if you should have any questions, or if we can be of further assistance. <br /> Resp�ctf�:lly submined, <br /> UNIVERSp►�. EN�IiYr E�ING SCIENCES, INC. <br /> Certi�icate of ;uthorization No. 549/GB33 <br /> �''`- � / . ���----�—.-_ <br /> ./� y;._ -., s:.';;���'�ri// <br /> Mark 4(. tiardy, P. �. ' <br /> Tampa Branch Manaqer <br /> Professional Engineer No. 57233 <br />
The URL can be used to link to this page
Your browser does not support the video tag.