Laserfiche WebLink
FORM 1100Ft-08 <br /> Code Compliance Cheklist <br /> Residential Whole Building Performance Method A- Details <br /> ADDRESS: PERMIT #: <br /> ZEPHYRHI�LS, FL, <br /> INFILTRATION REDUCTION COMPLIANCE CHECKLIST <br /> COMPONENTS I SECTION REQUIREMENTS FOR EACH PRACTICE CHECK <br /> Exterior Windows & Doors ' N1106.AB 1 1 Maximum: .3 cfm/s ft. window area_5 cfm/sq.ft. door area. <br /> Exterior & Adjacent Walls N1106.A6.1.2.1 Caulk, gasket, weatherstrip or seal between: windows/doors & � <br /> � frames, surrounding wall; foundation & wall sole or sill plate; joints � <br /> ; between exterior wall panels at corners; utility penetrations, � <br /> between wall panels � top/bottom plates; between walls and floor <br /> EXCEPTION: Frame walls where a continuous infiltration barrier is <br /> � installed that extends from, and is sealed to, the foundation to the <br /> to late. <br /> Floors i N1106.AB.1.2.2 Penetrations/openings > 1/8" sealed unless backed by truss or <br /> joint members. <br /> EXCEPTION: Frame floors where a continuous infiltration barrier <br /> is installed that is sealed to the erimeter, enetrations and seams. <br /> Ceilings �N1106.A6.1.2.3 Befween walls & ceilings, penetrations of ceiling plane to top floor; <br /> ' around shafts, chases, soffits, chimneys, cabinets sealed to <br /> continuous air barrier; gaps in gyp board & top plate; attic access <br /> EXCEPTION� Frame ceilings where a continuous infiltration barrier <br /> is installed that is sealed at the perimeter, at penetrations and <br /> seams. <br /> Recessed Lighting Fixtures N1106.AB 12.4 Type IC rated with no penetrations, sealed; or Type IC or non-IC <br /> rated, installed inside a sealed box with 1/2" dearance & 3" from <br /> insulation; or Type IC with < 2.0 cfm from conditioned space, <br /> tested. <br /> Multi-sto Houses N1106.A8.1.2.5 Air barrier on erimeter of floor cavi between floors. <br /> Additional Infiltration reqts I N1106.AB 1 3 Exhaust fans vented to outdoors, dampers; combustion space <br /> � heaters comply with NFPA, have combustion air <br /> OTHER PRESCRIPT(VE MEASURES (must be met or exceeded by all residences.) <br /> COMPONENTS__ __ I SECTION_ REQUIREMENTS CHECK <br /> Water Heaters , N1112.AB 3 Comply with efficiency requirements in Table N112.ABC 3 Switch <br /> i or ctearly marked circuit breaker (electric) or cutoff (gas) must be <br /> ___ ._ rovided External or built-in heat tra re uired <br /> Swimming Pools & Spas � N1112.A6.2.3 Spas 8� heated pools must have covers (except solar heated). <br /> Non-commercial pools must have a pump timer Gas spa & pool <br /> heaters must have a minimum thermal efficiency of 78% <br /> �.__ Heat um I heaters shall have a minimu COP o f 4 0 <br /> Shower heads � N1112.AB.2.4 Water flow must be restricted to no more than 2.5 gallons per <br /> minute at 80 PSIG. <br /> Air Distribution Systems I N1110.AB All ducts, fittings, mechanical equipment and plenum chambers <br /> shall be mechanical�y attached, sealed, insulated and installed in <br /> i accordance with the criteria of Section tV1110.A8 <br /> _ Ducts in unconditi attics: R-6 min. insu lation <br /> HVAC Controls i N1107.A62 I Separate readily accessible manual or automatic thermostat for <br /> each svstem. <br /> Insulation � N1104.AB 1 Ceilings-Min. R-19. Common walls-frame R-11 or CBS R-3 both i <br /> N1102.B.1.1 sides. Common ceiling 8� floors R-11 <br /> 3/212010 2:06 PM EnergyGaugeO USA - FlaRes2008 Page 5 of 5 <br />