Laserfiche WebLink
Zone Sizing Summary for UNIT A1 <br /> Project N�me' 291�2-Meetinghouse @ Zephirhills 12l10l2009 <br /> Prepared by SGM Engineering 10�08AM <br /> Air System Information <br /> Air System Name UNIT A1 Number of zones 1 <br /> Equipment Gass _ SPLT AHU Floor Area 700.0 ft' <br /> Air System Type SZCAV Location Tampa, Florida <br /> Sizing Calculation Information <br /> Zone and Space Sizing Method: <br /> Zone CFM Sum of space airflow rates Calcutation Months Jan to Dec <br /> Space CFM Individuai peak space loads Sizing Data Calcuiated <br /> Zone Sizing Data <br /> Ma�cimum Design Minimum Time Maximum Zone <br /> Cooling Air Air of Heating Floor <br /> 5ensibie Flow Flow Peak Load Area Zone <br /> Zone Name (MBN) (CFM) (CFM) Load (MBH) (ft� CFM/ft' <br /> Zone 1 9.7 526 526 Jul 1600 5.2 700.0 0.75 <br /> Zone Terminal Sizing Data <br /> No Zone Terminal Sizing Data required for this sysiem <br /> Space Loads and Airflows <br /> Cooling Time Air Heating Floor <br /> Zone Name ! Sensibie of Fiow Load Area Space <br /> Space Name Muit. (MBH) Load (CFM) (MBH) (ft') CPM/ft' <br /> Zone 1 <br /> UNIT A1 1 9.7 Jui 1600 526 5.2 700.0 0.75 <br /> Houriy Analysis Program v 4 4 Page 1 of 1 <br />