Laserfiche WebLink
38576 UALLiEY OAKS CIRCLE- BUILDING 3- 42 UNITS- 48,743 SQ'FT- - ' <br /> � Q� <br /> � _. <br /> SCI. FEET PRICE <br /> MAIN OR LIVING: <br /> OTHER AREA UNDER ROOF: -$ 91.00 <br /> OTHER: - $ - <br /> VALUATION $ 2,077.223.58 <br /> FEE SHEET $ 4,826.00 <br /> ADDRESS $ 30.00 <br /> DRIVEWAY $ 30.00 <br /> BUILDING: $ 4,982.52 <br /> ELECTRICAL: $ 1,085.85 <br /> PLUMBING: $ 723.90 <br /> MECHANICAL: $ 506.73 <br /> SUB-TOTAL $ 7,299.00 <br /> RADON: $ 509.37 <br /> TOTAL $ 7,808.37 <br /> SEWER: $ 59,094.00 <br /> WATER: $ 18,845.40 � <br /> IRRIGATION: $ - <br /> TOTAL: S 77,939.40 <br /> WATER METER: n!a <br /> IRRIGATION METER $ - n/a <br /> FIRE DEPARTMENT FEES <br /> PLANS TOTAL: $ 2,924.58 <br /> INSPECTION TOTAL: $ 2,880.00 <br /> PERMIT TOTAL <br /> TOTAL: � 5,804.58 <br /> PUBLIC SAFETY IMPACT FEES <br /> POLICE $ 10,668.00 <br /> FIRE $ 11,466.00 <br /> 5% $ 1,106.70 <br /> TOTAL: S 23,240.70 <br /> PARK IMPACT FEES $ 27,848.52 <br /> SUB-TOTAL $ 142,641.57 <br /> SIF'S: $ - <br /> 100.0% $ - <br /> 1.0% $ - <br /> TOTAL: $ - N/A <br /> T I F �s :$ ss,ssa.00 '`**�`Tif - Have the option to pay (entire amount)- or <br /> ss°io $ ss,sss.os 25% and 75% will have to be paid before Pre meter <br /> � °ia $ 695.94 25% $17,398.50 + $142,641.57 = $160,040.07 <br /> TOTAL: $ 212,235.57 75% due before pre meter -$52 <br /> OR PAY $212,235.57 <br />