My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11740
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 11:36:06 AM
Creation date
2/8/2012 11:35:58 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
11-11740
Building Department - Name
ZEPHYR COMMONS LLC
Address
7952 7954 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ZE�'t�YRHtLLS FlRE DEPART�VIE�IT <br /> w <br /> 6907 Dairy Road, Zephyrhills, FL , 33542 , <br /> Fire Chiet Keirh 1lViliiams Bus (813)780-Q041 Fax (813)7H0-0�44 <br /> FIRE SERVICE USER FEES <br /> Occupancy No.: <br /> Plan No.: — 3 '� Contractor: � <br /> Business Name. Billing Address: <br /> Business Address: `� )a-V �, � <br /> Business Phone No.: Billing Phone No.: <br /> Business Fax No.. Billing Fax No.: <br /> Contact. Contaet: <br /> PLAN REVIEW �EES INSPECTION FEES PERMIT FEE FALSE ALARM FEE <br /> 8 Site Plan N/C Annual N/C Sprinkler �50 1 st Alarm N/C <br /> Mulli .06 Sf 1st Re-inspection N/C Standpipes a50 2nd Alarm N!C <br /> (Minimum Charge $25.00 2nd Re-inspection �100 Fire Pump $50 3rd Alarm N/C <br /> � Plan Revisions DBL 3rd Re-inspection $250 oods r� /� 4th Alarm $100 <br /> 4th Re-Inspection a500 Fire Alarm � Sth Alarm a� 5p <br /> SPRINKLER SYSTEMS (Business cbsed until LP Gas a50 6th Alartn $2pp <br /> 0- 25 Heads a50 violations corrected) Natural Gas ESO NON COMPLIANCE $150 <br /> 26 plus Heads $100 SPRINKLER SYSTEMS Fuel Tanks- per w�k �p <br /> STANDPIPE SYSTEM Hydro Undergrounds $45 Sparklers $100 <br /> � Per Riser $50 Hydrostatic Test $65 per system Fire Works $50p <br /> FIRE PUMP Acceptance Test �45 Pe, syscem Camp Fire b25 <br /> � Per Pump $100 Hydrant Flow $75 Controlled Burn $100 <br /> FIRE ALARM SYSTEM Hood/Duct a50 <br /> 8 0- 25 Devices �50 FIRE ALARM SYSTEM Place of Assembly $50 Annual <br /> 26 plus Devices 3100 System Acceptance a50 Fire Protection $25 <br /> SUPPRESSION SYSTEMS Recall Acceptance $50 Flammable Application $50 n��ua� <br /> Wet $50 OTHER Waste Tire Storage $SO Annual <br /> Dry $50 Fire Wall/Smoke Wall $15 perwau Generator < KW $1 p0 <br /> CO2 $50 LP Gas $25 �� r��k Generator �30 KW 150 <br /> Other ��'/ Natural Gas $25 Per syscem Bio-Hazard Waste $100 Annual <br /> KITCHEN EXHAUST '�� Fumigation Tenting $50 <br /> � Hood/Ducts $50 Tent 10'x10' or greater $15 per tent Torch PoUApplied $50 <br /> OTHER Fire Pump /.�% Haz. Materials $100 nnnuai <br /> LP Installalion per tank $50 ife SUppre55i011 � <br /> Fuel Tank Installation $50 System Acceptance <br /> ❑ (Per Tank) $50 8 E�aust Hood�Duct $30 <br /> Natural Gas Installation $50 Re-inSpeCtiOn DBL <br /> (Per System) (otherthan annual) <br /> � Spray Booth $50 � Inspection scheduled DBL 8 <br /> and cancelled less than <br /> 24 hours <br /> 8 Construction Insp. N/C r <br /> Emergency Vehicle Ac� $50 � FALSE ALARM <br /> PLANS TOTAL � INSPECTION TOTAL � PERMIT TOTAL L� TOTAL �__ . � <br /> GRAND TOTAL ° j �'a � <br /> Comments: <br /> Date: �0 � <br /> Insq��ctor: �{� � I' G� <br />
The URL can be used to link to this page
Your browser does not support the video tag.