NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block" of this appl(cation for which they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACTlUTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a°ce�tificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Fu�thermore, if Pasco County WaterlSewer Impact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the °Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the "owner" prior to commencement.
<br /> CONTRACTOR'SlOWNER'S AFFIDAVIT: I ce�tify that all the information in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. i also
<br /> certify that i understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions i must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department of Health 8 Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone "V" unless expressly permitted.
<br /> - If the fiil material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill wili not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, i promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. i understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not speci�cally included in the application. A
<br /> permit issued shall be construed to be a ficense to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, cvnstruction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
<br /> WITH YOUR LENDER OR ATTORN BEFORE RECORDING YOUR NOTICE OF MME CE ENT.
<br /> FLORIDA JURAT (F. 17.03) � ,
<br /> OWNER OR AGENT ` CONTRACTOR
<br /> Subscribed and swo or a re s Subscribed and s to affl d) ore e this
<br /> by - % � �`' 1 b / ,
<br /> W o Is/are rson own to roduced pe � n ly k wn to or has e produced
<br /> �� , � as identHication.
<br /> / � .
<br /> : , � C- _ � , _ d �� �_.
<br /> � � � �� E tary Public
<br /> Com Commission No.
<br /> =�R Cur��tis�ion DR 734406 � 60BBIE S. SWETLAND
<br /> �r y� 2 Name of Notary
<br /> Nam ��� � Explrea ebruary 22, 2012
<br /> Oonaed Thru T�oy Fain ImlyYice 8pp3g5�7p19
<br /> ... . . - . `''Rr�� �onded Thru Troy Faln IMUrMio� BOOaB&7019
<br />
|