Laserfiche WebLink
Zephyrhills Fire Rescue <br /> 6907 Dairy Rcsad, 7cphyrhilis, FL 3�5�? <br /> Fire Marshal Rus (813) 780-0()41 <br /> hcrry F3arnctt Fax (81 ;) 7$0-00��4 <br /> E-mail: kbarnettln�,tire.rephyrhills.fl.us <br /> Plan Review #: 11-034 <br /> Project: Fire Sprinkler Modification <br /> Number of Pages: l plus Cut Sheets & Calcs <br /> April 12, 201 l <br /> I have received and reviewed the plans for the fire sprinkler modification located at 7326 Gall <br /> Blvd and will allow the project to move forward. By paying for the permit, contractor <br /> acknowledges to comply with the item below. Should anyone have any questions, please do not <br /> hesitate to contact the Fire Marshal's office. <br /> 1. FDC shall be a 5" 30 degree turndown Storz connection, if not already in place. <br /> 2. FDC sign shall be located at FDC. Sign shal) state "FDC" in 6" red reflective letters <br /> on white background and shall also state the address served. (should be there) <br /> 3. Tampers shall be installed on double backflow, if not already that way. <br /> 4. Properly tag system once completed. <br /> 5. Label all doors where riser is located, or where any other valves are located. <br /> (EXAMPLE: "SPRiNKLER RiSER") <br /> 6. Ensure adjacent system (Save-a-Lot) remains in operation. lf that system is to be shut <br /> down, notify that business. If to be shut down for more than 4 hours, notify this <br /> authority. <br /> Inspections Required: <br /> l. Pressure Test/Rough-in <br /> 2. Final (will be done in conjunction with fire alarm final) <br /> , �,__-___ _ _ <br /> KERRY BA TT, F1RE MARSHAL <br /> ***Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval ofthe <br /> submitted plans. it is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with alt applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveals areas of non-compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />