My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11763
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11763
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 1:59:16 PM
Creation date
2/8/2012 1:57:53 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
11-11763
Building Department - Name
TOWNVIEW RETAIL LLC
Address
7326 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7604 BAKER'BLVD. <br /> . w • � , � . , RICHLAND HILLS, TX 76118 <br /> � L' 1 f i� i'f � OFFICE: 817-717-2867 <br /> !> fJ f f � j FAX: 817-717-2868 <br /> C O N S T R U C T I O N <br /> SUBCONTRACTOR AGREEMENT <br /> This Agreement made this 16_day of _March 2011_, by and between _Eagle Fire Protection , hereinafter called the <br /> Subcontractor, whose principal office is at _1205 Crown Park Circle, Winter Garden FL 34787 and Tenant Build inc.. 7604 Baker <br /> Blvd. Richland Hilis, TX 76118, hereinafter called the Contractor Witnesseth that the Subcontractor and the Contractor, for the <br /> consideration hereinafter named, agree as follows: <br /> 1 Subcontractor agrees to furnish and pay for all materials, labor, supervision, equipment, tools, appliances, and everything <br /> necessary to fuliy do and complete the Fire Sprinkler work described in paragraph 2 hereof, for work at TJ Maxx 1194, <br /> 7326 Gali Blv�. Zephyrhills FKL 33541 for _TJX Companies , hereinafter called Owner, in accordance with the <br /> Drawings and Specifications prepared by _Rogue Architects_, dated _1.2Q 11 and hereby made a part of this <br /> suacon#ract. <br /> 2. Subcontractor shall provide all labor. materiais, eQUipment, supervision and insurance necessary or incidental for the execution and <br /> completion of the Subcontractor's Work to the full extent of the Contract Documents, regardless where shown or specified, <br /> specifically including but not necessarily limited to the following: <br /> a. Provide all labor. materials. svstem desiqn, permittinq and equipment to perform all Fire Sprinkier work to make job <br /> complete per plans and specifications. It is agreed and understood that the scope of work includes, but is not limited to <br /> the following: <br /> 1 Design of the Fire protection System. <br /> 2. Required permits for the Fire protection scope of work <br /> 3 Ail piping & Materials to be UL listed and per NFPA Standards <br /> 4 Gutting & capping of existing lines no longer required, this may involve some work in adjacent store spaces <br /> 5 Sprinkler Heads and trim rings are to be white in color <br /> 6. Supply and instali all flow and tamper switches <br /> 7 Contract includes applicabie taxes. <br /> b Subcontractor's application for payment must be submitted with a complete list of all material suppliers, equipment <br /> suppliers, and any subcontractors. <br /> c. Subcontractor shall do whatever is required to adhere to Tenant Build Inc.'s Construction schedule. <br /> d. It is the Subcontractor's responsibility to abide by all applicable OSHA and Safety procedures. <br /> e. Any secondary subcontractor must be approved by the Contractor prior to their work and their work at the site is the sole <br /> responsibility of the Subcontractor and is to be supervised by the Subcontractor <br /> f Subcontractor agrees to complete their punch list items within (7) calendar days of receipt of punch list. If all punch list <br /> items are not complete within that time frame, Tenant Build Inc. will proceed to have those remaining items corrected by <br /> others and these costs deducted from the balance due Subcontractor <br /> g. Suhcon'ractor agreas te provide ad�quate !abor. materials, and other resa�rces as �equired io mamtain the project <br /> schedule and achieve the date for Substantial Completion as it applies to the Subcontractor's Work <br /> h. Subcontractor must have a full time, competent foreman on the jobsite at all times while performing work. <br /> 3. An Insurance Certificate including General Liability coverage and any additional coverage required by the Subcontractor's policy <br /> and State requirements where work is being performed, must be provided by the Subcontractor's Insurance Company prior to wor{: <br /> being started and/or before any payments are made to Subcontractor <br /> 4 The Contractor agrees to pay the Subcontractor for the performance of his work the sum of $23,545 00 and to <br /> make payments on account thereof as follows: 100_% of the value of labor and materials incorporated by the Subcontractor in <br /> the work and of materials stored on the job site in a manner acceptable to Contractor No payment to Subcontractor shall operate <br /> as an approval of Subcontractor's work or materials, or any part thereof The final payment hereunder shall not be due until <br /> Subcontractor has delivered to Contractor a complete release of all liens in form and text satisfactory to Contractor <br /> 5 Subcontractor agrees to commence the work when directed by the contractor and to diligently and continuously prosecute work and <br /> to coordinate the work with other work being done on the project by other trades, so that Contractor shall not be delayed by any or <br /> omission of Subcontractor in completion of the general contract within the time specified in the contract documents. <br /> 6 No alterations shall be made in the work as shown or described by the Drawings and Specifications except on the written order of <br /> the Contractor, and when so made the value of the work or materials added or omitted shall be computed and determined by the <br /> Subcontractor, subject to the written approvai and accept4nce by the contractor, and the amount so determined shall be added or <br /> deducted from the subcontract price or prices. The subcontractor shall have no claim for additional work unless such work has <br /> been done in pursuance of a written order from the Contractor <br /> 1 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.