Laserfiche WebLink
i <br /> � <br /> � <br /> § 9.4 WARRANTY � <br /> The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be �� <br /> of good qnality and new unless the Contract Documents require or permit otherwise. The Contractar further warrants , <br /> that the Work will conform to the requirements of the Contract Documents and will be $ee from defects, except for <br /> those inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or equipment not <br /> conforming to these requirements may be considered defective. The Conh�actar's warranty excludes remedy for <br /> damage or defect caused by abuse, alterations to the Work not executed by the Contractor, improper or insufficient <br /> maint�ance, improper operation or normal wear and tear under normal usage. <br /> § 9.5 TAXES � <br /> I <br /> The Contractar shal2 pay sales, consumer, use and other similar taxes that are legally enacted when bids are received or <br /> negotiations concluded, whether or not yet effective or merely scheduled to go into effect. <br /> § 9.6 PERMITS, FEES, NOTICES, AND COMPLIANCE WITH LAWS <br /> § 9.6.1 Uriless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building <br /> pernut as well as other permits, fees, licenses and inspections by government agencies necessary for proper execution , <br /> and completion of the Work that are customarily secured after execution of the Contract and legally required at the � <br /> time bids are received or negotiations concluded. <br /> § 9.6.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, <br /> rules and regulations, and lawful arders of public autharities applicable to performance of the Work. If the Contractor <br /> performs Work lmowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and regulations, or <br /> lawful orders of public authorities, the Contractor shall assume appropriate responsibility for such Work and shall bear <br /> the costs attributable to correction. <br /> § 9.7 ALLOWANCES <br /> The Contractar shall include in the Contract Sum all allowances stated in the Contract Documents. The Owner shall <br /> select materials and equipment under allowances with reasonable promptness. Allowance amounts shall include the <br /> costs to the Contractor ofmaterials and equipment delivered at the site and all required taxes, less applicable trade <br /> discounts. Allowance amounts shall not include the Contractor's costs for unloading and handling at the site, labor, ! <br /> installadon, overhead, and profit. I� <br /> § 9.8 CONTRACTOR'S CONSTRUCTION SCHEDULES <br /> § 9.8.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit far the Owner's and <br /> Architect's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits <br /> current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the <br /> Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall <br /> provide for expeditious and practicable execution of the Work. <br /> § 9.8.2 The Contractor shall perform the Work in general accordance with the most recent schedule submitted to the <br /> Owner and Architect. <br /> § 9.9 SUBMITTALS <br /> § 9.9.1 The Contractor shall review for compliance with the Contract Documents and submit to the Architect Shop <br /> Drawings, Product Data, Samples and similar submittals required by the Contract Documents in coordination with the <br /> Contractor's construction schedule and in such sequence as to allow the Architect reasonable time for review. By <br /> sabmitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents to the Owner and <br /> Architect that the Contractor has (1) reviewed and apprwed them; (2) determined and verified materials, field <br /> measurements and field construction criteria related thereto, or will do so; and (3) checked and coordinated the <br /> information contained within such submittals with the requirements of the Work and of the Contract Documents. The <br /> Work shall be in accordance with approved submittals. <br /> § 9.9.2 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. <br /> i <br /> I <br /> AIA Document Ai 07T" — 2007. Copyright O 1936, 18b1, 1958, 1981, 1963, 1966, 1970, 1974, 1978, 1987, 1997 and 2007 by The American Inatitute of Architeets. i <br /> Init. ,qp N9hb reserved. WARNING; Thia AIA Doeument Is protacted by U.S. Copyright Law and InternaUonal Treatiea. Unau�orized roproductlon or <br /> distrlbution oi this AIA Document, or any portlon of k, may result In severe cNll and ehminal penaltles, and wlil be proseeuted to the maxlmum extent 8 � <br /> / posslble underthe law. This documentwas produced by AIA aoflware et 14:59:26 on 04l05I2011 under Order No.4716495922_1 which expires on 10/28/2011, � <br /> and Is not for resale. <br /> Uaer Notes: <br /> (1630881888) <br /> I <br />