<br /> § 9.4 WARRANTY �
<br /> The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be ��
<br /> of good qnality and new unless the Contract Documents require or permit otherwise. The Contractar further warrants ,
<br /> that the Work will conform to the requirements of the Contract Documents and will be $ee from defects, except for
<br /> those inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or equipment not
<br /> conforming to these requirements may be considered defective. The Conh�actar's warranty excludes remedy for
<br /> damage or defect caused by abuse, alterations to the Work not executed by the Contractor, improper or insufficient
<br /> maint�ance, improper operation or normal wear and tear under normal usage.
<br /> § 9.5 TAXES �
<br /> I
<br /> The Contractar shal2 pay sales, consumer, use and other similar taxes that are legally enacted when bids are received or
<br /> negotiations concluded, whether or not yet effective or merely scheduled to go into effect.
<br /> § 9.6 PERMITS, FEES, NOTICES, AND COMPLIANCE WITH LAWS
<br /> § 9.6.1 Uriless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building
<br /> pernut as well as other permits, fees, licenses and inspections by government agencies necessary for proper execution ,
<br /> and completion of the Work that are customarily secured after execution of the Contract and legally required at the �
<br /> time bids are received or negotiations concluded.
<br /> § 9.6.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes,
<br /> rules and regulations, and lawful arders of public autharities applicable to performance of the Work. If the Contractor
<br /> performs Work lmowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and regulations, or
<br /> lawful orders of public authorities, the Contractor shall assume appropriate responsibility for such Work and shall bear
<br /> the costs attributable to correction.
<br /> § 9.7 ALLOWANCES
<br /> The Contractar shall include in the Contract Sum all allowances stated in the Contract Documents. The Owner shall
<br /> select materials and equipment under allowances with reasonable promptness. Allowance amounts shall include the
<br /> costs to the Contractor ofmaterials and equipment delivered at the site and all required taxes, less applicable trade
<br /> discounts. Allowance amounts shall not include the Contractor's costs for unloading and handling at the site, labor, !
<br /> installadon, overhead, and profit. I�
<br /> § 9.8 CONTRACTOR'S CONSTRUCTION SCHEDULES
<br /> § 9.8.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit far the Owner's and
<br /> Architect's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits
<br /> current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the
<br /> Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall
<br /> provide for expeditious and practicable execution of the Work.
<br /> § 9.8.2 The Contractor shall perform the Work in general accordance with the most recent schedule submitted to the
<br /> Owner and Architect.
<br /> § 9.9 SUBMITTALS
<br /> § 9.9.1 The Contractor shall review for compliance with the Contract Documents and submit to the Architect Shop
<br /> Drawings, Product Data, Samples and similar submittals required by the Contract Documents in coordination with the
<br /> Contractor's construction schedule and in such sequence as to allow the Architect reasonable time for review. By
<br /> sabmitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents to the Owner and
<br /> Architect that the Contractor has (1) reviewed and apprwed them; (2) determined and verified materials, field
<br /> measurements and field construction criteria related thereto, or will do so; and (3) checked and coordinated the
<br /> information contained within such submittals with the requirements of the Work and of the Contract Documents. The
<br /> Work shall be in accordance with approved submittals.
<br /> § 9.9.2 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents.
<br /> i
<br /> I
<br /> AIA Document Ai 07T" — 2007. Copyright O 1936, 18b1, 1958, 1981, 1963, 1966, 1970, 1974, 1978, 1987, 1997 and 2007 by The American Inatitute of Architeets. i
<br /> Init. ,qp N9hb reserved. WARNING; Thia AIA Doeument Is protacted by U.S. Copyright Law and InternaUonal Treatiea. Unau�orized roproductlon or
<br /> distrlbution oi this AIA Document, or any portlon of k, may result In severe cNll and ehminal penaltles, and wlil be proseeuted to the maxlmum extent 8 �
<br /> / posslble underthe law. This documentwas produced by AIA aoflware et 14:59:26 on 04l05I2011 under Order No.4716495922_1 which expires on 10/28/2011, �
<br /> and Is not for resale.
<br /> Uaer Notes:
<br /> (1630881888)
<br /> I
<br />
|