Laserfiche WebLink
e. Post Sqacin4: Line Posts shall be spaced equidistant at intervals not to exceed <br /> 10'. <br /> f. Bracinp: Brace terminat posts back to adjacent line posts with horizontal 1-5/8" <br /> SCH 40 brace rails and diagonal truss rods. <br /> g. Top Rail: Install through line post caps connecting sections with sleeves to form <br /> a continuous rail between terminal posts <br /> h. Bottom Tension Wire: Stretch befinreen terminal posts 6" above grade and <br /> fasten to the outside of line posts with tie-wires.. <br /> i. Fabric: Pull fabric taut with bottom selvage 1 to 2 inches above grade. Fasten <br /> to terminal posts with tension bars threaded through mesh and secured with <br /> tension bands at maximum 15" intervals. Tie to line posts and top rails with tie- <br /> wires, spaced at a maximum 12" on posts, and 24" on rails. Attach to bottom <br /> tension wire with hog rings at maximum 24" intervals. <br /> j Fasteners: Install carriage bolts and nuts facing the outside of the fence. <br /> k. The Contractor will be required to obtain all required inspections <br /> Drive (New) Installation: <br /> a Installation of a new asphalt drive which is to connect the existing drive to South Avenue. <br /> The drive must be two lanes wide and will be approximately (150 +/-) lineal feet. The <br /> asphalt drive, payment markings, and permanent road signs must meet FDOT standards. <br /> b. Any electronic wiring will need to be installed prior to new asphalt is layed. <br /> c. The Contractor will obtain all required inspections. <br /> Warranty: <br /> a. Contractor shall provide a one (1) year unconditional warranty on all workmanship and <br /> materials. <br /> Completion: <br /> a. The area of installation shall be left free of debris caused by the installation of the fence. <br /> b Upon completion, a representative from the Airport Department shall inspect the fence <br /> materials and workmanship to assume that all quality control standards are in compliance <br /> with the specifications contained herein. <br /> c. This project must meet all FAA, FDOT and UL code requirements. <br /> 23 <br />