My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11919
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2012 9:13:36 AM
Creation date
3/30/2012 9:12:19 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
11-11919
Building Department - Name
FMC MARKET SQUARE INC
Address
38105 MARKET SQUARE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> , � � O <br /> � � + -I �- � , + <br /> • Widely accepted substitute � . <br /> for Schedule 40 NPS Nominal I.D. Wt. Wt. (H20 Filled) CRR CRR <br /> Standard han el' S 8C11't In; mm In; mm Lbs/Ft; k!m Lbs/Ft; k Im Unthreaded Threaded <br /> � g p g 1" 1.080 1330 1 75 11.39 1 00 <br /> • UL and cUL listed z5 z�a z.o z.6o - - <br /> i�ia° � nos i.a�o zsn 9 50 � oa <br /> • FM approved 3z 35.8 z.e 3.�s - - <br /> i'/i" 1 639 2.290 3 22 9 14 1 00 <br /> 40 41.6 3.4 4.79 — — <br /> 2"' 2.104 3 050 4.57 8 41 1 00 <br /> <_>� Combining the safety and 50 53.4 a.s 6.so - - <br /> (ongevity of Sch-40 with u u <br /> quality �rrd hydraulic O �O , FM o <br /> advantages. <br /> Dyna-Thread' Fipe is the full line Schedule <br /> 40 replacement with the same CRR of �7 Superiar Coating �hread is UL and cUL listed for wet, dry <br /> Schedule 4Q 1 00, providing Dyna-Thread Dyna-Thread products are coated �fvith an deluge and pre-adion sprinkler systems <br /> with the same iife expectancy as Sch-40 environmentally approved and specially and Rvl approved for use in wet systems. <br /> With outstanding hydraulic capabilities, formulatetl modified-acrylic or vdater-based Dyna-Thread can be hot dip galvanized*' <br /> Dyna-Thread is a more widely accepted coating. This durable coating is pa,�table to meet FP✓1 requirements for use in dry <br /> product substitution than lightwall and acts as an excelleri primer while sy�stems. Dyna-Thread is approved for aJ <br /> threadable pipE when Sch-40 is specified. resisting weather and UV degradation threaded couplings and welded outiets <br /> from outdoor storage. and is suitab�e for all roll-grooved and <br /> Dyna-Thread's ins!de diameter is up to plain end fittings. <br /> 3 6% larger than Sch-40 and provides <br /> improved hydraulics. �Nhen used in � American Made <br /> combination with Dyna-Flow pipe, down Able to meet 'Buy American" <br /> sizing of pipe and related components requirements, and is availab!e through <br /> often octurs, th�reby reducirg costs. d'stributors in the USA, Canada, Mexico <br /> The consistent quality of steel used to <br /> and Latin Amenca. <br /> make Dyna-ThrE�ad facilitates smooth <br /> threading and lower mamtenance costs. ��� 5peeifitation5 & Approval5 <br /> Increased strenqth and lighter weight Dyna-Thread pipe is marufactured to <br /> allows Dyna-Thread to reduce installation meet ASTP� A-135, Type E Grade A, is m <br /> fatigue and mak.es it ideal for retro-fit compliance with NFPa-13 and ali sizes are <br /> applications. rated at 300 psi ti^,�orking pressure. Dyna- <br /> `" must he oraFre� r'Q b�.ind!e n;r2rrenrs <br /> ^� Customer Service (800) 882-5543 Fax: (800) 659-7730 www,alliedtube-sprinkler.com <br /> `� • 16100 S Lathrop Ave. • 11350 Norcom Rd. • 2525 N 27th Ave. • 600 Dean 5ievers Place <br /> TUBE & COPJDUIT• Harvey, IL 60426 Philadelphia, PA 19154 Phoenix, AZ 85009 Morrisville, PA 19067 <br /> m2009-10 Tyco Int., All Rights Reserved, STP-S3-3-NON-1003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.