My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11932
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11932
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2012 9:25:41 AM
Creation date
3/30/2012 9:25:40 AM
Metadata
Fields
Template:
Building Department
Company Name
THE YOUNG GROUP INC
Building Department - Doc Type
Permit
Permit #
11-11932
Building Department - Name
THE YOUNG GROUP INC
Address
5914 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z��� FIRE DEPART�AEIV� <br /> 6907' Dairy Road, Zephyrhiils, FL 33542 <br /> Fere Chief Ke�th Wiflidms Bus (813)780-UU41 Fax (813)780-OU�d4 <br /> FIRE SERVICE USER FEES <br /> Occupancy No.: <br /> Plan No.: / — Contractor: __ ��. � �; � j= � <br /> Business Name� � / Billing Address: /fr � ���";�. � �„ C„� �) <br /> Business Address: �% �y EsA � � r- <br /> a-c.. 3 ,. Z�- <br /> Business Phone No Billing Phone No.: �-�, �-'7� <br /> Business Fax No.: Billing Fax No.: <br /> Contact Contact: <br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE FALSE ALARM FEE <br /> 8 Sfte Plan N/C Annual N!C Sprinkler $50 1 st Alarm N/C <br /> Mult� O6 sf 1 st Re-inspection N/C Standpipes $50 2nd Alarm N/C <br /> (Minimum Charge $25.00 2nd Re-inspection $100 Fire Pump $50 3rd Alarm N/C <br /> � Plan Revisions DBL 3rd Re-inspection $250 Hoods, �650 4th Alarm $100 <br /> 4th Re-Inspection $500 Fire Alarm 5th Alarm g� 50 <br /> SPRINKLER SYSTEMS (Business closed until LP Gas $50 6th Alarm $200 <br /> 0- 25 Heads $50 violations coRected) Natural Gas $50 NON COMPLIANCE $150 <br /> 26 plus Heads $100 SPRINKLER SYSTEMS Fuel Tanks- pe� ca�k $Sp <br /> STANOPIPE SYSTEM Hydro Undergrounds a4S Sparklers $�pp <br /> � Per Riser $50 Hydrostatic Test $65 �� system Fire Works $Spp <br /> FIRE PUMP Acceptance Test $45 Pe� syscem Camp Fire $25 <br /> � Per Pump $100 Hydrant Flow $75 Controlled Burn $100 <br /> FIRE AIARM SYSTEM Hood/Duct $5p <br /> 8 0- 25 Devices $50 FIRE AIARM SYSTEM Place of Assembly $50 An�ual <br /> 26 plus Devices $100 System Acceptance a50 Fire Protection $� <br /> SUPPRESSION SYSTEMS Recall ACCeptance $50 Flammable Application $50 annuai <br /> Wet $50 OTHER Waste Tire Storage $50 qnnual <br /> ��Y $50 Fire Wall/5moke Wall $15 per wan Generator < KW $� pp <br /> CO2 LP Gas $25 �� r��k Generator >3p KW 15p <br /> ' Other 350 Naturat Gas 325 per system BiaHazard Waste $100 Annual <br /> KITCHEN EXHAUST Fumigation Tenting $50 <br /> � Hood/DuC4s $50 Tcnt 10'x10' or greater $15 <br /> per tent TO►ch PoUApplied $50 <br /> OTHER Fire Pump $45 Haz. Materials $100 Annual <br /> LP Instal�ation per lank $50 Fire Suppression ' a3(y( <br /> Fuel Tank Installation $50 System Acceptance �"' <br /> (Per Tank) $50 Exhaust Hood/Duct $30 <br /> � Natural Gas Installation $50 Re DBL <br /> ( Per System ) (other than annual} <br /> � Spray Booth $SO � lnspection scheduled DBL 8 <br /> and cancelled less than <br /> 24 hours <br /> Construction Insp. N/C <br /> �.. <br /> Emergency Vehicle Ac� $50 '� FALSE ALARM <br /> PLANS TOTAL (� r)� INSPECTION TOTAL �� PERMIT TOTAL I___� TOTAL <br /> t�-�, I---_ I <br /> GRAND TOTAL � <br /> Comments <br /> Date. � � � � 1 <br /> Insq��ctor� .� r"✓ y r� t �`�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.