My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11980
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2012 11:21:34 AM
Creation date
3/30/2012 11:21:33 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
11-11980
Building Department - Name
ZEPHYR COMMONS LLC
Address
7652 7654 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zephyrhills Fire Rescue <br /> 6907 Uairy Rc>ad, "L.ephyrhills, l� L 33542 <br /> l�ire Marshal Bus (8l3} 780-0041 <br /> Kerry 13ar�lett I�aa (813) 780-UU4� <br /> E-mail: kbarnett(c�tire.zephyrllills.fl.us <br /> Plan Review #: 11-078 <br /> Project: Hood/Duct Installation <br /> Number of Pages: 2 <br /> June 9, 2011 <br /> 1 have received and reviewed the revised -ft�'r t�re installatio� of tlie �1� nd duct for the <br /> commercial kitchen located at 795 al lvd and will allow it to move forward. ying for <br /> permit acknowledges the contrac r will comp y. ou anyone ave any questions, please do <br /> not hesitate to contact the Fire Marshal's office. <br /> 1. Inspections have taken place prior to the submittal. Two light tests were <br /> conducted to check the quality of the welds and a final was conducted at the same <br /> time a building final was being obtained. There was a fine assessed for conducting <br /> work w/o a permit ($100.00) however the work was allowed to continue by this <br /> authority to keep the project moving forward. Fine shall be paid prior to a full CO <br /> given for the building final. <br /> 2. Ensure ceramic fire blanket is installed not only were it is within 18 inches of <br /> combustible but also within 3 inches of limited combustibles. <br /> 3. Ensure access door locations are marked. <br /> 4. 3rd party test and balance is required and shall be submitted to this authority at <br /> time of final. <br /> Inspection Required: <br /> 1. Light Test <br /> 2. Final <br /> KERRY BARNETT, FIRE MARSHAL <br /> ***Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br /> submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with all applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveals areas of non-compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.