My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11989
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2012 11:31:12 AM
Creation date
3/30/2012 11:29:19 AM
Metadata
Fields
Template:
Building Department
Company Name
T-MOBILE
Building Department - Doc Type
Permit
Permit #
11-11989
Building Department - Name
T-MOBILE
Address
38122 HENRY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date� April 21, 2011 <br /> Peggy Anderson Tower Engineering Professionals <br /> T-Mobile Towers 3703 Junction Blvd <br /> 12920 SE 38th Street Raleigh, NC 27603 <br /> Bellevue, WA 98006 (919) 661-6351 <br /> Office: (425) 383-3537 aruckerC�teparoup.net <br /> Subject: Structural Analysis Report – Revision 1 <br /> Carrier Designation: Metro PCS Co-Location <br /> Site Number: Unknown <br /> Site Name: TAM681 B <br /> T-Mobile Designation: Site Number: A2G0082A <br /> Site Name: Pasco County (VS) <br /> Engineering Firm Designation: TEP Project Number: 110908 <br /> Site Data: 38122 Henry Dr., Zephyrhills, Pasco County, FL 33540 <br /> Latitude N 28 ° 14' S2.9'; Longitude W 82 ° 11' 9.4" <br /> 190 Foot – Self-Supporting Tower <br /> Dear Ms Anderson, <br /> Tower Engineering Professionals is pleased to submit this "Structural Analysis Report" to determine the <br /> structural integrity of the above mentioned tower <br /> The purpose of the analysis is to determine structural acceptability of the structure stress level Based on our <br /> analysis we have determined the stress level for the structure and foundation, under the following load case, to <br /> be: <br /> LC1: Existing + Proposed + Future Equipment Sufficient Capacity <br /> Note See Table 1 for the existing, proposed, and future loading. <br /> Structure Controlling Component <br /> Ca aclt <br /> 84.5% Legs (120 - 140 <br /> The analysis has been performed in accordance with the ANSI/TIA-222-G-2-2009 Structural Standard for <br /> Antenna Supporting Structures and Antennas – Addendum 2 and the 2007 Florida Building Code (with 2009 <br /> Supplement). <br /> All modifications and equipment proposed in this report shall be installed in accordance with the appurtenances <br /> listed in Table 1 for the determined available structural capacity to be effective <br /> We at Tower Engineering Professionals appreciate the opportunity of providing our continuing professional <br /> services to you and T-Mobile Towers. If you have any questions or need further assistance on thi or any other <br /> projects please give us a call \\\ „� � ��,//// <br /> Resp ctfull s bmitted by: \`\ ��� 0 �' �����// <br /> � Q' � <br /> = = N o r . 7 809 =: yt _ <br /> drewT dane, P.E. � �'�/ / 1 2r�Zv1) - <br /> RevlslOn — � = STATE flF ` � - <br /> # Date Issued Descrlptlon � 0= : ��\ <br /> 0 March 8, 2011 Original structural analysis report �/ ��QRID�';.�''' �� ��� <br /> 1 April 21, 2011 Revised structural analysis to include proposed ��/�s 1.p • � a � ��\ <br /> Metro PCS loadin ���lll I I I1���� <br /> RISA Tower Report - version 5.4.2.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.