Laserfiche WebLink
, Project: ZEPHYRHILLS CHURCH <br /> ' Title: ZEPHYRHILLS CHURCH OF CHRIST <br /> Type: Religious Building <br /> (WEA FYIe: FL_TAMPA INTERNATIONAL AP.tm3) <br /> Building End Uses <br /> 1) Proposed 2) Baseline <br /> TOtal 32.30 44.60 <br /> $S10 $704 <br /> ELECTRICITY(MBtulkWh/S) 3230 44.60 <br /> 9488 13036 <br /> $S10 $704 <br /> AREA LIGHTS a.�o s.2o <br /> 1274 2389 <br /> $68 $129 <br /> MISC EQUIPMT 9.00 9.00 <br /> 2637 2637 <br /> $142 $142 <br /> PUMPS 8 MISC o.to o.io <br /> 19 16 <br /> $1 $1 <br /> SPACE COOL ii.6o is.00 <br /> 3404 4399 <br /> $183 ,5238 <br /> SPACE HEAT o.ao i.io <br /> 125 317 <br /> $7 $17 <br /> VENT FANS 6.90 ii.2o <br /> 2029 3278 <br /> �109 $177 <br /> Passing requires Proposed Building cost to be at most 85% PASSES <br /> of Baseline cost. This Proposed Building is at 72.4% <br /> EnergyGauge Summil� Fla/Com-2008. Effeetive: Marc� 1, 2009 <br /> 6/15/2011 Page 4 of 7 <br />