NOTICE OF DEED RESTRICTIONS. The undersigned understands that this permit may be subject to "deed" restrictions"
<br /> which may be more resVictive than Counry regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed resVictions.
<br /> UNLICENSEO CONTRACTORS AND CONTRACTOR RESPONSIBILITIES. If the owner has hired a contractor or
<br /> conVactors to undeRake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not Iicensed as required by law, both the owner and conVador may be cited for a misdemeanor violation
<br /> under state law If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009 Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County
<br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES. The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the consUuction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> permitting. It is turther understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a"certificate of occupancy" or final power release. If the project dces not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco Counry Water/Sewer Impact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the "Florida ConsVuction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the "owne�' prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certity that all the information in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no wo�lc or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning reguladons, and land devebpment regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other govemment agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmenfal Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, WatedWastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, WeUand Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department of Health 8 Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following resVicctions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone "V" unless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certiTy that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached pertnit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construcdon. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not speafically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, consVuction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the pertnit is suspended or abandoned for a period of six (6) months after the time fhe work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonsVate
<br /> justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDA JURAT (F.S. 117.03)
<br /> OWNER OR AGENT U�.�C N.GL�'�-- CONTRACTOR�
<br /> ` Subsai and swo)n to (or a�� ed)�efore me this ubsc= and swo to ( f ed) efore me Mis
<br /> by l4PCC /�r_p C� � by fC
<br /> Who islare personally k n to me or has/have produced Who islare personally kn to me or ha5/have produced
<br /> identification. �� as ident�catlon.
<br /> Notary Public ��' Notary Public
<br /> Commission No. Commission No.
<br /> Name oi Nota sta
<br /> Nam =I ed �r stamped �' h' � P� �ey ry Public State of Flarida
<br /> � � �Y ublic State of Florida . F Bruce q qspe�
<br /> ; Bruce A qspe�
<br /> '� � � M Commission DD989010 � ` MY Commission OD989010
<br /> 9 �or no� E Pires 06/22/2074 or n.� Expires 06/22/2014
<br />
|